Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • IRF Examiner launched as industry resource to boost efficiency
    May 19, 2014
    Volume 1 highlights life-saving role of new methods and proven technologies around the world Since the IRF’s establishment in 1948, knowledge transfer has been the core of what the IRF does best. As industry tools and procedures evolve to meet societies’ needs, the availability of global knowledge resources is now more important than ever.
  • Liebherr 150EC-B is latest flat-top crane
    January 6, 2017
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.
  • Liebherr 150EC-B is latest flat-top crane
    February 7, 2013
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.
  • Tsurumi launches new dewatering pump on anniversary
    February 28, 2013
    Submersible pump manufacturer Tsurumi, marking its 30th anniversary in Europe, is launching a new engine driven pumps and a life-extending kit for its products. The new diesel-driven pump (4TBA82D135) is one of Tsurumi’s biggest, and is designed to work at the most demanding dewatering and sewage applications, offering a maximum flow of 2,250litres/minute and a maximum head of 18m. Tsurumi will also introduce a set of life-extending parts for its KTV and KTVE range of lightweight aluminium pumps, saying tha