Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • More EU money for Fehmarn Belt Link
    July 4, 2022
    The money underlines the importance of the 17.6km Fehmarnbelt tunnel project for the entire European road network.
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Electrical tender launched for Fehmarn tunnel
    February 10, 2021
    The winner must set up a renewable energy centre for its work.
  • German government to adhere to Fehmarn Belt tunnel plans
    April 30, 2015
    Germany is to adhere to plans for a tunnel between Fehmarn, Germany, and Lolland, Denmark despite criticism over the cost and a delayed schedule. Denmark alone is likely to foot the €7.4 billion bill for the prestigious Fehmarn Belt Fixed Link immersed tunnel while Germany will pay for only access roads and other connections on its territory. Angela Merkel, Chancellor of Germany, said her government and transport authorities will respond to more than 3,000 objections over the construction of the tunne