Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • LiuGong turns its attention to Europe
    April 20, 2015
    Chinese group explains why it is expanding into Europe, stressing the importance of the market to the long-term health of the industry – and Dressta, the Polish firm LiuGong acquired, talks about its own plans.
  • Wildlife risk to drivers survey being conducted
    June 29, 2016
    A researcher based in Canada is carrying out a research project in the form of a survey assessing the safety risk posed by wildlife to drivers. The risk posed by wildlife to those travelling in vehicles can be severe in some areas and evaluating data can be important for assessing risk levels and awareness of risk levels amongst road users. There is the potential for serious injury or even death in the event of crashes with large animals or at high speeds. Meanwhile a driver avoiding an animal in the roadwa
  • Bentley Systems calls for submissions to 2016 Be Inspired Awards
    June 2, 2016
    Bentley Systems, a global provider of software solutions for advancing infrastructure, has announced a call for submissions to the 2016 Be Inspired Awards programme. The deadline for entries is June 10, 2016. The awards, which are selected by independent juries of industry experts, recognise the extraordinary work of organisations that help advance the world’s infrastructure by designing, engineering, constructing, delivering, and/or operating safer, more resilient, sustainable, and intelligent roads,
  • London’s congestion charge is saving lives, a study suggests
    March 9, 2015
    Traffic accidents in the UK capital London have declined 40% since the introduction of a congestion charge in 2003, according to a new study. The number of accidents per million miles driven in the congestion zone fell to 2.6 accidents per million miles from an average of 12.4 before the introduction of the charge. Researchers at Lancaster University also found a similar fall in the number of people seriously injured or killed. As well, accident rates fell in adjacent areas as a result of fewer motorists dr