Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • IBTTA global summit 2014 takes a balanced view on sustainable transport
    October 8, 2014
    The upcoming International Bridge, Tunnel, and Turnpike Association (IBTTA) 2014 global summit in Prague, Czech Republic, will be focusing on “Sustainable Transport & Mobility for People and Goods” say the organisers with key sessions looking at “strategic issues such as interoperability (EETS/REETS), road safety, environmental protection, traffic in cities, big data, road user charging around the World and future developments, trends, and technologies.”
  • Mumbai names BrihanMumbai Municipal as winner for coastal freeway
    April 15, 2015
    The state government of Maharashtra in India has named BrihanMumbai Municipal Corporation (BMC) as preferred bidder for construction of Mumbai’s Coastal Freeway worth around US$1.36 billion. The 35.6km freeway, subject to clearance from the central government in New Delhi, will run from Mumbai’s business district, called Nariman Point, to the northern suburb of Kandivli. Coastal Freeway, which runs beside the sea, on reclaimed lands, landfill sites and some small bridges, is the alternative to the mor
  • Call for SME exhibitors at Road Infrastructure Innovation Expo, Brussels
    April 2, 2013
    SMEs developing innovative solutions to improve road infrastructure now have until 12 April, 2013, to apply to exhibit free-of-charge at the first Road Infrastructure Innovation Expo being held in Brussels, Belgium, 4-6 June 2013. Due to the involvement of additional countries and the final constitution of the scientific committee for the Infravation programme, organisers have extended the exhibitor registration deadline. All research fields are welcome addressing the theme of Advanced and Innovative Constr