Skip to main content

Delays have hit the Czech Blanka Tunnel

Further delays are adding to the sorry tale of woe surrounding the construction of the Blanka Tunnel project in the Czech Republic. The tunnel was supposed to improve connectivity and reduce traffic congestion in Czech capital Prague. However following a series of disagreements over the work being carried out as well as the spiralling cost, financing, legal problems and various technical issues, the construction of the tunnel has finally ground to a halt. Czech construction firm Metrostav has said that it w
December 12, 2013 Read time: 2 mins
Further delays are adding to the sorry tale of woe surrounding the construction of the Blanka Tunnel project in the Czech Republic. The tunnel was supposed to improve connectivity and reduce traffic congestion in Czech capital Prague. However following a series of disagreements over the work being carried out as well as the spiralling cost, financing, legal problems and various technical issues, the construction of the tunnel has finally ground to a halt. Czech construction firm Metrostav has said that it will not restart work. Metrostav is looking for a payment of €78.43 million from Prague City Council before it will restart its activity on the tunnel. Some work will be carried out by Czech construction firm CKD Praha DIZ in the mean-time. The cost of the project has spiralled and was originally estimated at €948 million but is now expected to exceed €1.31 billion.

Related Content

  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Moveable barrier cuts costs, aids motorists
    February 20, 2012
    Work on an award-winning US bridge was completed with savings and benefits to motorists through the help of an innovative barrier. The bridge replacement of US 31 over I-465 and Lick Creek in southern Indianapolis, state capital of Indiana, won the 2011 Honor Award from the American Council of Engineering Companies of Indiana. Stephen J. Christian & Associates of Indianapolis completed the design in less than nine months to allow Indiana Department of Transportation (INDOT) to take advantage of the favourab
  • Cameroon contracts faces financing problems
    May 25, 2017
    A major highway project in Cameroon faces funding issues as China has suspended its financing for the Yaoundé - Douala link. The highway has an estimated cost of US$473.3 million and the project includes a 68km link between the country’s capital and its second city, as well as an additional 23km of link roads. The link is being built by China First Highway Engineering (Cfhec) with funding by Eximbank. However a disagreement between Cameroon and the Chinese has resulted in the funding being halted for a peri
  • Stonehenge Bypass approved in the UK
    November 13, 2020
    The UK Government has approved the construction of the Stonehenge Bypass.