Skip to main content

Delay for key section of Algeria highway

Delays are afflicting the official opening of a stretch of the East-West highway in Algeria. This 84km section of the highway connects Dréan in the east of Algerian to the border with neighbouring Tunisia. A Japanese contractor was in charge of the project to construct the 400km eastern stretch of the East-West highway. However financial problems surrounding the need for additional work led to construction of the final stretch being curtailed. There is concern that should the work be left unfinished any lon
August 19, 2016 Read time: 2 mins
Delays are afflicting the official opening of a stretch of the East-West highway in Algeria. This 84km section of the highway connects Dréan in the east of Algerian to the border with neighbouring Tunisia. A Japanese contractor was in charge of the project to construct the 400km eastern stretch of the East-West highway. However financial problems surrounding the need for additional work led to construction of the final stretch being curtailed. There is concern that should the work be left unfinished any longer, it would likely cost significantly more to complete the stretch of highway. The East-West highway forms a key section of the North African highway route that connects Morocco with Egypt. Delays to the construction of this new route have also arisen due to political unrest in the region, particularly in Libya although there have also been issues in Algeria, Tunisia and Egypt.

Related Content

  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would
  • Virginia I-95 highway section opening
    August 22, 2023
    A Virginia I-95 highway stretch is opening.
  • Africa’s road builders need a reliable supply of good-quality bitumen
    May 8, 2015
    Crying out for consistency Getting hold of the right product, or any product at all, is often the challenge, as delegates to the Argus Africa Bitumen conference heard Many parts of Africa have ambitious road building plans for the next few decades. But clients and contractors are facing problems with the quality and supply of bitumen, delegates at the Argus Africa Bitumen conference were told. If there was one overriding message to come out of the conference, held in Dar Es Salaam, Tanzania in Feb
  • Paraguay road upgrade delayed
    December 17, 2018
    Work to upgrade a section of Paraguay’s Route 8 between Caazapa and Yuty is finally close to completion. The work to improve the 73km section of the highway is some two years behind schedule. The bridge spanning the Pirapo River that forms part of the project is already open to traffic however. The South Korean contractor Ilsung Construction is currently carrying out the paving work for the project. The firm is also building an additional 12.7km of new access roads to provide connections to Maciel, Yegros,