Skip to main content

Contract problem for Algeria’s East-West Highway

Further problems surround the project to construct Algeria’s East-West Highway. Much of the route is complete, however a number of sections have faced delays with disputes having developed between contractors and the Algerian Government, which is overseeing the project. This latest development has seen the Algerian Ministry for Public Works announcing that the Japanese firm Cojaal has lost its contract to construct the remaining 84km of the eastern section of the East-West highway. It is not clear at presen
October 10, 2014 Read time: 2 mins
Further problems surround the project to construct Algeria’s East-West Highway. Much of the route is complete, however a number of sections have faced delays with disputes having developed between contractors and the Algerian Government, which is overseeing the project. This latest development has seen the Algerian Ministry for Public Works announcing that the Japanese firm Cojaal has lost its contract to construct the remaining 84km of the eastern section of the East-West highway. It is not clear at present when the highway will be complete. The Algerian Ministry for Public Works has also said that two contractors will take over the work from Cojaal, with this expected to cost less than before. Overall the total cost of the East-West Highway will not exceed US$11 billion, according to the Algerian Ministry for Public Works. Cojaal and the Algerian Ministry for Public Works have yet to agree on compensation levels for the contract having been terminated and the arbitration procedure will be carried out in Algeria, as the contract does not provide for international arbitration.

Related Content

  • Runway resurfacing in Sardinia with Wirtgen machines
    December 7, 2017
    The fleet used comprised two Wirtgen W 210s and one W 200i, as well as two Wirtgen WR 2000 soil stabilisers. Located roughly 8 km north-west of the city of Alghero, Alghero-Fertilia Airport is one of three commercial airports on the Italian island, along with Cagliari Elmas and Olbia. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally handles military aircraft. However commercial flights represent its main traffic and as it serves the provinces of Sassari and Oristano, it is
  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Earth Day inauguration for US animal crossing
    April 22, 2022
    Construction starts today, Earth Day, on the 67m-long Wallis Annenberg Wildlife Crossing at Liberty Canyon in the US state of California and which will be the biggest in the world .
  • Key projects in hand for India
    September 7, 2015
    The Indian Government plans to build a new highway connecting Katra with New Delhi. The route will be some 600km long, running through Punjab, Haryana, Jammu and Kashmir. A consultant is being selected to carry out a feasibility study for the project. The project will cost in the order of US$2.25 billion and will be of importance as Katra is where the Vaishno Devi holy shrine is located. The new link will reduce travel time on the route from 11-12 hours at present to five-six hours when the work is complete