Skip to main content

Consortium constructing challenging route in Chilean capital Santiago?

The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Constructi
January 29, 2014 Read time: 2 mins
The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by 980 OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group 930 Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with 3959 Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Construction will begin in 2015, after the approval of environmental impact studies and detailed engineering plans. The tender was split in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The Plan entails building and operating a 9.3km underground expressway running from El Salto Avenue to Príncipe de Gales avenue under the current Américo Vespucio route. The missing link in the city's beltway was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, opposition from residents in La Reina and Peñalolén districts as well as concerns over the high cost of this option persuaded the 968 Chilean Government to split the project and call a tender only for the first 9.3km stretch. Vespucio Oriente will be built on two levels, each one hosting a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour from the current 3,000/hour in a bid to tackle the city’s chronic congestion. The project has been delayed several times and the Chilean Government is reviewing options for the construction of the remaining 4km.

For more information on companies in this article

Related Content

  • Chilean bridge project
    September 21, 2021
    An important Chilean bridge project has faced delays.
  • Spanish road association opens highway award competition
    September 23, 2013
    The Spanish Road Association (FAEC) now opening its fifth International Award for Innovation in Highway Juan Antonio Fernández del Campo competition to entries. This biennial competition started in 2005 with the aim of promoting research and innovation in the road infrastructure sector. Spanish is used for the entrants as the language of international scientific reference. The prize can be awarded for various factors to a single person or teams of individuals, designers of projects, studies, for research or
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De