Skip to main content

Consortium constructing challenging route in Chilean capital Santiago?

The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Constructi
January 29, 2014 Read time: 2 mins
The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by 980 OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group 930 Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with 3959 Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Construction will begin in 2015, after the approval of environmental impact studies and detailed engineering plans. The tender was split in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The Plan entails building and operating a 9.3km underground expressway running from El Salto Avenue to Príncipe de Gales avenue under the current Américo Vespucio route. The missing link in the city's beltway was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, opposition from residents in La Reina and Peñalolén districts as well as concerns over the high cost of this option persuaded the 968 Chilean Government to split the project and call a tender only for the first 9.3km stretch. Vespucio Oriente will be built on two levels, each one hosting a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour from the current 3,000/hour in a bid to tackle the city’s chronic congestion. The project has been delayed several times and the Chilean Government is reviewing options for the construction of the remaining 4km.

For more information on companies in this article

Related Content

  • Chile’s US$1 billion Chiloe Island bridge behind schedule
    February 22, 2024
    Chile’s US$1 billion bridge to link Chiloe Island with the mainland is behind schedule.
  • Chilean project re-tendering
    April 26, 2012
    The Chilean authorities have had to re-launch the tender process for the 187km La Serena – Vallenar highway project. A consortium, Azvi-Copasa, originally won the tender for the project in 2010 but struggled to find the necessary financing. As a result, Chile's Ministry of Public Works (MOP) has been forced to restart the tendering process and open the project for bidding once more.
  • Somague consortium wins deal for Ponte 25 de Abril
    September 27, 2018
    Portuguese infrastructure operator Infraestruturas de Portugal has awarded Somague a €12.6 million maintenance and refurbishment contract for work on the bridge Ponte 25 de Abril. Somague is heading up a consortium that includes Sociedade de Montagens Metalomecânicas and Reparação, Consolidação e Modificação de Estruturas. The 25 de Abril, a 2.3km suspension bridge for vehicles and trains over the Tagus River, connects Portugal’s capital city Lisbon to the municipality of Almada. It was built by the A
  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C