Skip to main content

Bolivia dual carriageway project stalled

Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
September 12, 2016 Read time: 2 mins
Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of lanes from two to four. The work would also cut crashes on the route and improve the local economy by boosting transport, trade and commerce. The route skirts around the Amboro National Park and its upgrade could help bring tourist trade to the area, further developing the local economy. To the west of Yapacani the road snakes through a series of mountain switchbacks to Cochabamba while to the south of Montero it heads to Santa Cruz de la Sierra. The International Development Bank (IDB) provided a US$122 million loan to help fund the road widening work back in 2012, with the project having been approved in 2013. However ABC grew frustrated with Tradeco’s level of progress on the road project, with the deal then being cancelled. Although ABC did say it would see work restarting on the project during 2016 with a different contractor carrying out the construction, this has not yet been achieved.

Related Content

  • Bolivia boosts road building budget
    September 22, 2014
    An investment of nearly US$510 million is being planned in Bolivia for road building works. The country’s state-run road company, Administradora Boliviana de Carreteras (ABC), has plans in hand for a total of 32 road maintenance and construction projects in Santa Cruz department. In all these will stretch for some 5,773km. Of this, $291 million will be spent on 276km of new roads, including the Saavedra-Chane and Circunvalacion Mineros, Hardeman-Colonia Pairi and Rio Uruguaito-Santa Rosa de la Roca-San Igna
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in
  • Bolivia road upgrade funded by World Bank
    January 16, 2017
    A loan worth US$230 million from the World Bank will help pay for a major highway upgrade in Bolivia. The highway connects San Ignacio de Velasco and San Jose de Chiquitos in Santa Cruz. The funding will pay for the route to be paved with a new surface, which will help deliver lower journey times for road users, as well as improving safety levels. The upgrade to the road will help to increase capacity and will also provide a boost to the local economy in the Santa Cruz area of the country.
  • Major plan for Bolivian highway expansion underway
    July 9, 2014
    Bolivia has a major programme of highway expansion and improvements underway at present in a plan designed to improve the country’s transport links. The programme includes 16 double-lane highways being built, costing some US$1.85 billion in all. The work is being managed by the state-run road administration company ABC. The roads will improve connections to La Paz, Oruro, Santa Cruz and Cochabamba. The road between La Paz and Oruro is 80% finished. The other projects will be finished between 2015 and 2018.