Skip to main content

Argentina upgrading roads to highways

Argentina’s Government has plans to upgrade Route 5, Route 7 and Route 8 into highways. The work will cost US$647.2 million and the first sections are already being completed. Around 210km of Route 7 will be upgraded to a highway while a 165km stretch of Route 8 will be upgraded to a highway. The work on Route 8 will reach Solis in 2017 and Pergamino in 2019, while Route 5 will be turned into a highway between Lujan and Bragado, with the work due for completion in 2019.
March 7, 2016 Read time: 1 min
Argentina’s Government has plans to upgrade Route 5, Route 7 and Route 8 into highways. The work will cost US$647.2 million and the first sections are already being completed. Around 210km of Route 7 will be upgraded to a highway while a 165km stretch of Route 8 will be upgraded to a highway. The work on Route 8 will reach Solis in 2017 and Pergamino in 2019, while Route 5 will be turned into a highway between Lujan and Bragado, with the work due for completion in 2019.

Related Content

  • Malaysian expressway upgrade work planned
    March 7, 2023
    Upgrade work is planned for a key expressway in Malaysia.
  • Road improvement works are planned for East England
    May 13, 2021
    Road improvement works are being planned between Peterborough and Great Yarmouth.
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the