Skip to main content

Argentina upgrading roads to highways

Argentina’s Government has plans to upgrade Route 5, Route 7 and Route 8 into highways. The work will cost US$647.2 million and the first sections are already being completed. Around 210km of Route 7 will be upgraded to a highway while a 165km stretch of Route 8 will be upgraded to a highway. The work on Route 8 will reach Solis in 2017 and Pergamino in 2019, while Route 5 will be turned into a highway between Lujan and Bragado, with the work due for completion in 2019.
March 7, 2016 Read time: 1 min
Argentina’s Government has plans to upgrade Route 5, Route 7 and Route 8 into highways. The work will cost US$647.2 million and the first sections are already being completed. Around 210km of Route 7 will be upgraded to a highway while a 165km stretch of Route 8 will be upgraded to a highway. The work on Route 8 will reach Solis in 2017 and Pergamino in 2019, while Route 5 will be turned into a highway between Lujan and Bragado, with the work due for completion in 2019.

Related Content

  • Rwanda highway Rwanda's major highway construction aids regional integration
    April 16, 2012
    Shem Oirere reports on plans for a major highway to Rwanda to other parts of Africa Construction of a 78km highway stretch that links Rwanda to the rest of Eastern Africa will start in May. State Minister in Charge of Transport Dr Alex. Nzahabwanimana said the contract for the US$54 million project has already been awarded to German construction company Strabag International.
  • Czech road project awards and tender
    July 19, 2024
    Czech road projects have been awarded, with another due to open for tender.
  • Egyptian Government opening key project tender
    May 11, 2012
    The Egyptian Government is opening the tender process for the Rod el Farag highway in July 2012. The highway project is expected to cost US$1 billion to construct and will be carried out in two stages. One section will run from Alexandria Desert Road to the Cairo Ring Road. Meanwhile the second section will run from the Cairo Ring Road to the eastern side of the Nile-Shoubra area and the Al Ismailia Canal Road.
  • Philippines toll road deal reached
    October 15, 2019
    The first three stretches of the Cavite-Laguna Expressway in the Philippines should be open to traffic by the end of October 2019. Around 10,000 vehicles/day are expected to use the three stretches when they open. The 45km route is costing US$653.4 million to develop. When it is fully commissioned in the second quarter of 2022, will cut journey times between CAVITEx and SLEx to 45 minutes, compared with 150 minutes that it has taken to travel previously. MPCALA Holdings has the concession package for the ro