Skip to main content

Algeria to engage Japanese government over dispute with Cojaal

The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
January 14, 2015 Read time: 3 mins
The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal,

In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.

The East-West Highway runs along the Mediterranean area of Algeria, with the eastern section running from the province of Bourdj Bou Arreridj to the Tunisian border. The road will drastically reduce the time of up to three days to drive across northern Algeria.

Cojaal - the Consortium Japonais Pour l'Autoroute Algérienne - is a joint venture comprising five of Japan’s largest companies: Japan’s two largest contractors 2809 Kajima and 2808 Taisei, general contractors 2811 Hazama and Nishimatsu as well as the trading house 4081 Itochu.

According to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal information from Kajima Visit www.kajima.com Website false http://www.kajima.com/news_events/special_features/vol2/vol2-1.html false false%>, Cojaal was to build a six-lane motorway with three lanes on each side, 43 bridges on the main route and three tunnels. “It is one of the largest infrastructure projects ever to be undertaken by Japanese companies outside of Japan,” Kajima said at the time of the contract award.

Completion of the entire East-West Highway was originally scheduled for 2010 and most of it is completed, except for the eastern section, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17854 0 oLinkExternal as reported Visit WH Story Page false /categories/road-highway-structures/news/work-to-restart-on-key-algerian-highway-section/ false false%> by 3260 World Highways in June. But last October, Algeria’s Minister of Public Works Abdelkader Kadi terminated the contract with Cojaal to build the eastern section’s final 84km after a part of the Djebel el Ouahch tunnel in Constantine constructed by COJAAL collapsed in January last year.

Algerian Press Service reported that Kadi said the last stretch of the eastern section will be awarded to other companies, but he gave no details of which firms stood to gain the work.

Kadi also said he was confident that a satisfactory outcome for both parties will be agreed before June. However, he noted that he was also confident that Cojaal would recognise its responsibility for the delays to work over several years and the tunnel problems.

Kadi confirmed that a 13km bypass, costing nearly $57 million, is being built to resolve traffic problems due to the collapse of the tunnel and should be operational by June.

For more information on companies in this article

Related Content

  • Shantui and Manitowoc agree joint venture to manufacture cranes in China
    January 28, 2013
    Manitowoc Cranes and Shantui Investment intend to form a new joint venture. This will build mobile cranes in China for both domestic and export markets. The name of the joint venture will be Shantui Manitowoc Crane Company, and it will commence operations once all relevant approvals are received. Within China, the cranes produced by the joint venture will be sold through Shantui’s vast domestic dealer network, in addition to Manitowoc’s own dealer network for truck cranes. The joint venture and this distrib
  • Cifa’s concrete leading position in world market
    January 6, 2017
    Cifa is among the leading worldwide manufacturers of concrete machinery and equipment. The company, under the China-based Zoomlion ownership since 2008, has sales and after-sales networks on all continents. In addition to its range of reliable, high-quality products, Cifa also offers customers financial support through Zoomlion Capital Financial Services.
  • Fuller EmiControls on emissions
    March 27, 2013
    EmiControls new large turbine – the V22 – will be showcased at bauma 2013. The company, which began trading independently in 2012, offers mobile and stationary solutions for optimum dust emission control during demolition, recycling plant, quarry, mining and industrial-based applications.
  • Cifa’s concrete leading position in world market
    March 27, 2013
    Cifa is among the leading worldwide manufacturers of concrete machinery and equipment. The company, under the China-based Zoomlion ownership since 2008, has sales and after-sales networks on all continents. In addition to its range of reliable, high-quality products, Cifa also offers customers financial support through Zoomlion Capital Financial Services.