Skip to main content

Algeria to engage Japanese government over dispute with Cojaal

The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
January 14, 2015 Read time: 3 mins
The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal,

In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.

The East-West Highway runs along the Mediterranean area of Algeria, with the eastern section running from the province of Bourdj Bou Arreridj to the Tunisian border. The road will drastically reduce the time of up to three days to drive across northern Algeria.

Cojaal - the Consortium Japonais Pour l'Autoroute Algérienne - is a joint venture comprising five of Japan’s largest companies: Japan’s two largest contractors 2809 Kajima and 2808 Taisei, general contractors 2811 Hazama and Nishimatsu as well as the trading house 4081 Itochu.

According to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal information from Kajima Visit www.kajima.com Website false http://www.kajima.com/news_events/special_features/vol2/vol2-1.html false false%>, Cojaal was to build a six-lane motorway with three lanes on each side, 43 bridges on the main route and three tunnels. “It is one of the largest infrastructure projects ever to be undertaken by Japanese companies outside of Japan,” Kajima said at the time of the contract award.

Completion of the entire East-West Highway was originally scheduled for 2010 and most of it is completed, except for the eastern section, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17854 0 oLinkExternal as reported Visit WH Story Page false /categories/road-highway-structures/news/work-to-restart-on-key-algerian-highway-section/ false false%> by 3260 World Highways in June. But last October, Algeria’s Minister of Public Works Abdelkader Kadi terminated the contract with Cojaal to build the eastern section’s final 84km after a part of the Djebel el Ouahch tunnel in Constantine constructed by COJAAL collapsed in January last year.

Algerian Press Service reported that Kadi said the last stretch of the eastern section will be awarded to other companies, but he gave no details of which firms stood to gain the work.

Kadi also said he was confident that a satisfactory outcome for both parties will be agreed before June. However, he noted that he was also confident that Cojaal would recognise its responsibility for the delays to work over several years and the tunnel problems.

Kadi confirmed that a 13km bypass, costing nearly $57 million, is being built to resolve traffic problems due to the collapse of the tunnel and should be operational by June.

For more information on companies in this article

Related Content

  • German mining equipment sales reach record high
    April 16, 2013
    The German mining machinery market is at a record high, according to the German Engineering Federation, VDMA. Mining machinery manufacturers based in Germany hardly suffered from the financial crisis, said VDMA president Dr Thomas Lindner. Since 2007, their annual turnover has grown by about 13% on average. In 2011, growth was nearly 27% and turnover then increased by another 28% in 2012 to reach €6.2bn.
  • Access safety and jobs with IPAF
    January 6, 2017
    IPAF (the International Powered Access Federation) will use Bauma to take visitors through its Safety Experience, a walk-through learning experience on how to use powered access equipment safely and effectively. The outdoor stand will highlight the association’s “Spread the load” campaign promoting the correct use of spreader plates, share results and findings from its growing accident reporting database. Falls from height are still the single largest killer in the workplace, says IPAF, and powered access i
  • Access safety and jobs with IPAF
    February 15, 2013
    IPAF (the International Powered Access Federation) will use Bauma to take visitors through its Safety Experience, a walk-through learning experience on how to use powered access equipment safely and effectively. The outdoor stand will highlight the association’s “Spread the load” campaign promoting the correct use of spreader plates, share results and findings from its growing accident reporting database. Falls from height are still the single largest killer in the workplace, says IPAF, and powered access i
  • Faster than a speeding cow – your local bus maybe?
    May 22, 2015
    A methane-powered bus has set a speed record for a regular city bus of nearly 124km/h at a test track in the UK, according to media reports. The bus, from the southern city of Reading, was converted to run on compressed methane from cow manure and was painted black and white like a Friesian cow. Mechanics removed the bus’s engine governor that restricted the vehicle’s speed to 90km/h. The bus then broke the record on the banked high-speed circuit at Millbrook Proving Ground, near the city of Bedford.