Skip to main content

Algeria to engage Japanese government over dispute with Cojaal

The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
January 14, 2015 Read time: 3 mins
The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal,

In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.

The East-West Highway runs along the Mediterranean area of Algeria, with the eastern section running from the province of Bourdj Bou Arreridj to the Tunisian border. The road will drastically reduce the time of up to three days to drive across northern Algeria.

Cojaal - the Consortium Japonais Pour l'Autoroute Algérienne - is a joint venture comprising five of Japan’s largest companies: Japan’s two largest contractors 2809 Kajima and 2808 Taisei, general contractors 2811 Hazama and Nishimatsu as well as the trading house 4081 Itochu.

According to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal information from Kajima Visit www.kajima.com Website false http://www.kajima.com/news_events/special_features/vol2/vol2-1.html false false%>, Cojaal was to build a six-lane motorway with three lanes on each side, 43 bridges on the main route and three tunnels. “It is one of the largest infrastructure projects ever to be undertaken by Japanese companies outside of Japan,” Kajima said at the time of the contract award.

Completion of the entire East-West Highway was originally scheduled for 2010 and most of it is completed, except for the eastern section, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17854 0 oLinkExternal as reported Visit WH Story Page false /categories/road-highway-structures/news/work-to-restart-on-key-algerian-highway-section/ false false%> by 3260 World Highways in June. But last October, Algeria’s Minister of Public Works Abdelkader Kadi terminated the contract with Cojaal to build the eastern section’s final 84km after a part of the Djebel el Ouahch tunnel in Constantine constructed by COJAAL collapsed in January last year.

Algerian Press Service reported that Kadi said the last stretch of the eastern section will be awarded to other companies, but he gave no details of which firms stood to gain the work.

Kadi also said he was confident that a satisfactory outcome for both parties will be agreed before June. However, he noted that he was also confident that Cojaal would recognise its responsibility for the delays to work over several years and the tunnel problems.

Kadi confirmed that a 13km bypass, costing nearly $57 million, is being built to resolve traffic problems due to the collapse of the tunnel and should be operational by June.

For more information on companies in this article

Related Content

  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Bentley Systems calls for submissions to 2016 Be Inspired Awards
    June 2, 2016
    Bentley Systems, a global provider of software solutions for advancing infrastructure, has announced a call for submissions to the 2016 Be Inspired Awards programme. The deadline for entries is June 10, 2016. The awards, which are selected by independent juries of industry experts, recognise the extraordinary work of organisations that help advance the world’s infrastructure by designing, engineering, constructing, delivering, and/or operating safer, more resilient, sustainable, and intelligent roads,
  • On-board weighing from the Outset
    January 6, 2017
    Outset was the first Italian company to introduce on-board weighing systems for commercial vehicles. The firm’s industrial electronic systems are applied on commercial, earthmoving, environment and logistic sector vehicles, and in several other areas like quarries, yards, and building stores to give the exact carried weight of aggregates and liquid materials, as well as goods such as waste, logging, cereals, powder, animal feed, ash and mud.