Skip to main content

Algeria to engage Japanese government over dispute with Cojaal

The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
January 14, 2015 Read time: 3 mins
The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal,

In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.

The East-West Highway runs along the Mediterranean area of Algeria, with the eastern section running from the province of Bourdj Bou Arreridj to the Tunisian border. The road will drastically reduce the time of up to three days to drive across northern Algeria.

Cojaal - the Consortium Japonais Pour l'Autoroute Algérienne - is a joint venture comprising five of Japan’s largest companies: Japan’s two largest contractors 2809 Kajima and 2808 Taisei, general contractors 2811 Hazama and Nishimatsu as well as the trading house 4081 Itochu.

According to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal information from Kajima Visit www.kajima.com Website false http://www.kajima.com/news_events/special_features/vol2/vol2-1.html false false%>, Cojaal was to build a six-lane motorway with three lanes on each side, 43 bridges on the main route and three tunnels. “It is one of the largest infrastructure projects ever to be undertaken by Japanese companies outside of Japan,” Kajima said at the time of the contract award.

Completion of the entire East-West Highway was originally scheduled for 2010 and most of it is completed, except for the eastern section, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17854 0 oLinkExternal as reported Visit WH Story Page false /categories/road-highway-structures/news/work-to-restart-on-key-algerian-highway-section/ false false%> by 3260 World Highways in June. But last October, Algeria’s Minister of Public Works Abdelkader Kadi terminated the contract with Cojaal to build the eastern section’s final 84km after a part of the Djebel el Ouahch tunnel in Constantine constructed by COJAAL collapsed in January last year.

Algerian Press Service reported that Kadi said the last stretch of the eastern section will be awarded to other companies, but he gave no details of which firms stood to gain the work.

Kadi also said he was confident that a satisfactory outcome for both parties will be agreed before June. However, he noted that he was also confident that Cojaal would recognise its responsibility for the delays to work over several years and the tunnel problems.

Kadi confirmed that a 13km bypass, costing nearly $57 million, is being built to resolve traffic problems due to the collapse of the tunnel and should be operational by June.

For more information on companies in this article

Related Content

  • Algeria bypass project underway
    December 1, 2015
    Work is now underway on a series of projects in Algeria, including the East West Highway and a key highway bypass. The 67km Khémis Miliana-Berrouaghia bypass is expected to cost around US$836 million, with work due for completion at the end of 2016. The project is being handled by an Algerian/Italian team.
  • Turkmenistan starts construction of Ashgabat-Turkmenbashi road
    May 8, 2015
    Turkmenistan has started construction of the 544km Ashgabat-Turkmenbashi highway under a public-private partnership contract. The deal is expected to cost between US$800-900 million for every 2km or so of road construction from Ashgabat in central Turkmenistan to Turkmenbashi, a city of around 90,000 on the eastern coast of the Caspian Sea. For a YouTube video graphic representation of the highway, click here. To see World Highways report onTurkmenistan’s highways projects in 2011, click here. Türkmenb
  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention
  • Contract problem for Algeria’s East-West Highway
    October 10, 2014
    Further problems surround the project to construct Algeria’s East-West Highway. Much of the route is complete, however a number of sections have faced delays with disputes having developed between contractors and the Algerian Government, which is overseeing the project. This latest development has seen the Algerian Ministry for Public Works announcing that the Japanese firm Cojaal has lost its contract to construct the remaining 84km of the eastern section of the East-West highway. It is not clear at presen