Skip to main content

Start of Torrens section upgrade of Adelaide’s North-South Corridor

Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr
August 12, 2015 Read time: 2 mins
Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor.

Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway.

The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestrian routes.

The South Australia state government said that up to 52,000 vehicles a day use the road which has suffered severe congestion. The upgrade should boost capacity to around 115,000 vehicles a day when work is completed by the end of 2018.

The state government said the project, along with a $455 million upgrade to the 2.km Darlington section to begin later this year, are part of general enhancements for North-South Corridor.

Funding for both projects has come from the federal government and the South Australia government.

More information about the Torrens Road to River Torrens North-South Corridor upgrade can be found by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal clicking here Visit www.infrastructure.sa.gov.au website false http://www.infrastructure.sa.gov.au/t2t false false%>.

Related Content

  • Komatsu Europe International introduces its new HM300-3 articulated truck
    February 7, 2012
    Komatsu Europe International’s recently introduced HM300-3 articulated truck has a flywheel horsepower of 242kW and is powered by a Komatsu SAA6D125E-6 engine that is EU Stage IIIB and EPA Tier 4 Interim emission certified.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    July 6, 2018
    A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
  • Bristol, UK: when a parking space is just too small
    May 8, 2015
    People park in the smallest of places, despite the best efforts of urban street designers and town planners to ensure an orderly arrangement of suitably spaced cars. Surly some spaces are just too small to park even the smallest car. But the city of Bristol, in southwest England, has taken no chances and has painted the double yellow ‘no parking’ lines in areas no one in their right mind could squeeze a car. Click here to see just how small the space is that authorities in Bristol have felt they need
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    June 26, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region. At its first ERF biennial Symposium on Road Infrastructure Challenges in June, more than 100 stakeholders heard the ERF demand the “ope