Skip to main content

Start of Torrens section upgrade of Adelaide’s North-South Corridor

Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr
August 12, 2015 Read time: 2 mins
Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor.

Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway.

The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestrian routes.

The South Australia state government said that up to 52,000 vehicles a day use the road which has suffered severe congestion. The upgrade should boost capacity to around 115,000 vehicles a day when work is completed by the end of 2018.

The state government said the project, along with a $455 million upgrade to the 2.km Darlington section to begin later this year, are part of general enhancements for North-South Corridor.

Funding for both projects has come from the federal government and the South Australia government.

More information about the Torrens Road to River Torrens North-South Corridor upgrade can be found by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal clicking here Visit www.infrastructure.sa.gov.au website false http://www.infrastructure.sa.gov.au/t2t false false%>.

Related Content

  • Video: Chinese cars levitate at crossroads
    December 23, 2015
    Watch as the vehicles appear to be grabbed by some invisible power, tossed around and chucked backwards up in the air. Startled onlookers stare at the van drivers struggle to get out of their cabs.
  • A Chinese loan will help develop Macedonia’s roads
    December 4, 2012
    A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho