Peri’s new MXK lightweight platform makes London debut

The new platform system MXK from German-based manufacturer Peri is easily assembled to suit site requirements. The flexible platform system with lightweight brackets is assembled at ground level, using lightweight components – scaffold support bracket stop-end rails, guardrail posts, the scaffold deck and the side mesh barriers PMB. Flexibility is the key, said Peri UK managing director Alasdair Stables during an indoor demonstration day held in the docklands area of the UK capital London. The object
July 8, 2015 Read time: 3 mins
PERI now offers an innovative new platform system
The new platform system MXK from German-based manufacturer 298 Peri is easily assembled to suit site requirements.

The flexible platform system with lightweight brackets is assembled at ground level, using lightweight components – scaffold support bracket stop-end rails, guardrail posts, the scaffold deck and the side mesh barriers PMB.

Flexibility is the key, said Peri UK managing director Alasdair Stables during an indoor demonstration day held in the docklands area of the UK capital London. The object is first to provide an extremely safe working environment and secondly to provide an extremely flexible platform that takes fewer people and less time to assemble, as well as take down.

The systems is completely compatible with the Maximo scaffold system and also the more traditional Trio scaffold system. Platforms come in three sizes – 2.4m, 1.2m and 0.9m – for use on panels that make up the Maximo and Trio form systems.

Peri’s MXK system is used mostly on smaller projects where heights are not so great and demands on the platform performance is not as high as that required of Peri’s FB 180-3 folding platform that is delivered to the construction site completely pre-assembled.

Marco Schwieb, a Peri Germany technician on hand to show refinements that the company has made over the years to its the Maximo scaffold system, introduced at bauma 2007, the international trade fair for construction, building and mining machines held in Munich, Germany. Over the years, Peri has improved the system, thanks to feedback from customers large and small, said Schwieb.

Tweaks and improvements to the Maximo include notches in Maximo’s modular panels that allow the accurate, quick and non-destructive insertion of a long lever bar between panel edge and concrete to nudge the panel up from a concrete base. Peri also developed a lever bar that is inserted into a hole in the side of a panel; when leverage is applied the bar’s large plastic roller touches the new concrete and doesn’t leave indents or scratches to mar the surface that will remain in sight.

One of the first UK projects in which Peri was involved was the cable-stayed Queen Elizabeth II Bridge over the River Thames, just south of London in 1990. More than 35 box piers up to 53m were shuttered with Peri’s Vario tension-proof wall formwork with GT 24 girders combined with the CB 240 climbing system with a pour height of 5m. The bridge’s 450m long central span is suspended 65m above the river to accommodate the passage of ocean-going vessels.

For more information on companies in this article

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t