Skip to main content

Peri’s new MXK lightweight platform makes London debut

The new platform system MXK from German-based manufacturer Peri is easily assembled to suit site requirements. The flexible platform system with lightweight brackets is assembled at ground level, using lightweight components – scaffold support bracket stop-end rails, guardrail posts, the scaffold deck and the side mesh barriers PMB. Flexibility is the key, said Peri UK managing director Alasdair Stables during an indoor demonstration day held in the docklands area of the UK capital London. The object
July 8, 2015 Read time: 3 mins
PERI now offers an innovative new platform system
The new platform system MXK from German-based manufacturer 298 Peri is easily assembled to suit site requirements.

The flexible platform system with lightweight brackets is assembled at ground level, using lightweight components – scaffold support bracket stop-end rails, guardrail posts, the scaffold deck and the side mesh barriers PMB.

Flexibility is the key, said Peri UK managing director Alasdair Stables during an indoor demonstration day held in the docklands area of the UK capital London. The object is first to provide an extremely safe working environment and secondly to provide an extremely flexible platform that takes fewer people and less time to assemble, as well as take down.

The systems is completely compatible with the Maximo scaffold system and also the more traditional Trio scaffold system. Platforms come in three sizes – 2.4m, 1.2m and 0.9m – for use on panels that make up the Maximo and Trio form systems.

Peri’s MXK system is used mostly on smaller projects where heights are not so great and demands on the platform performance is not as high as that required of Peri’s FB 180-3 folding platform that is delivered to the construction site completely pre-assembled.

Marco Schwieb, a Peri Germany technician on hand to show refinements that the company has made over the years to its the Maximo scaffold system, introduced at bauma 2007, the international trade fair for construction, building and mining machines held in Munich, Germany. Over the years, Peri has improved the system, thanks to feedback from customers large and small, said Schwieb.

Tweaks and improvements to the Maximo include notches in Maximo’s modular panels that allow the accurate, quick and non-destructive insertion of a long lever bar between panel edge and concrete to nudge the panel up from a concrete base. Peri also developed a lever bar that is inserted into a hole in the side of a panel; when leverage is applied the bar’s large plastic roller touches the new concrete and doesn’t leave indents or scratches to mar the surface that will remain in sight.

One of the first UK projects in which Peri was involved was the cable-stayed Queen Elizabeth II Bridge over the River Thames, just south of London in 1990. More than 35 box piers up to 53m were shuttered with Peri’s Vario tension-proof wall formwork with GT 24 girders combined with the CB 240 climbing system with a pour height of 5m. The bridge’s 450m long central span is suspended 65m above the river to accommodate the passage of ocean-going vessels.

For more information on companies in this article

Related Content

  • Chile's challenging bridge and tunnel construction
    February 27, 2012
    SACYR Chile is constructing a bridge on the new Northeast Access Highway in the capital Santiago, and when complete the 22.5km route will link the suburbs of Vitacura and Colina to the city. Acceso Nororiente, opening this year, is the fifth urban freeway in Santiago and stands out because of the challenges in the construction of its bridges ands tunnels.
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap