Skip to main content

Gold star for Goldhofer’s STZ-VP (285) loader semi-trailer

The latest addition to Goldhofer’s STZ-VP family is the “big boy”, whose 285mm tyres makes it the company’s loader semi-trailer with the highest load-carrying capacity. It has proven pendular axle technology available in configurations between three and 10 axles as well as a choice of decks - vessel bridge, crawler deck and flatbed. It also has a technically permissible axle load of around 15.5tonnes and a deck profile of only 200mm for the flatbed, putting it slimmest on the market, according to Goldhofer
April 17, 2018 Read time: 2 mins
The latest addition to 1449 Goldhofer’s STZ-VP family is the “big boy”, whose 285mm tyres makes it the company’s loader semi-trailer with the highest load-carrying capacity. It has proven pendular axle technology available in configurations between three and 10 axles as well as a choice of decks - vessel bridge, crawler deck and flatbed.


It also has a technically permissible axle load of around 15.5tonnes and a deck profile of only 200mm for the flatbed, putting it slimmest on the market, according to Goldhofer. Chassis design of the STZ series features a combination of extremely wide excavator recesses and relatively short bogies.

Goldhofer’s pendular axle technology has precision-calculated geometry of the axle suspension for free oscillation of the wheelsets. The creates optimum distribution of the load to all the tyres and perfect leveling in uneven terrain. A steering angle of up to 65° rounds off the benefits with perfect manoeuvrability, the company says. In order to keep maintenance costs to a minimum, axle suspension is available with a choice of tapered roller or compact bearings to meet customers’ individual requirements in terms of mileage and maintenance intervals.

With the STZ-VP (285), the STZ family now has a version that can handle much heavier loads thanks to the bigger tyres and a maximum fifth-wheel load of 47tonnes.

For more information on companies in this article

Related Content

  • All-terrain crane additions to ILC fleet
    May 18, 2018
    A key logistics provider in the Middle East, Integrated Logistics Company (ILC), has bought the first two Demag AC 300-6 all-terrain cranes from Terex Cranes. ILC says that it plans to put the cranes to work at several jobsites throughout the Gulf region. The new six-axle Demag AC 300-6 all-terrain crane offers a 300tonne maximum lifting capacity and features an 80m main boom. This new six-axle Demag all terrain crane is said to offer versatility needed for carrying out demanding jobs for lower operational
  • Komatsu launches next-generation WA475-11 and WA485-11 wheeled loaders with joystick steering controls
    April 10, 2025

    Komatsu Europe has premiered its new next-generation WA475-11 and WA485-11 wheeled loaders, which the manufacturer says represent a leap forward in performance and efficiency.

    At the heart of new Dash 11 generation wheeled loaders is a newly developed Komatsu diesel engine which is characterised by extremely high torque in the low-speed range. This new engine is combined with a Komatsu-designed hydro-mechanical-transmission (HMT), resulting in excellent performance, power reserves, fuel efficiency and ease of operation for all transport and loading tasks.  

  • Haulotte showcases Pulseo electric mobile elevating platform
    April 24, 2018
    Haulotte is presenting Pulseo, its new electric rough-terrain mobile elevating platform, at Intermat. Designed to lower energy costs as well as reduce air and noise pollution, the solution can be deployed in indoor and outdoor applications and operate in low-emission and low-noise zones. In addition, the electric architecture, according to Haulotte, make it suitable for work in downtown areas and green construction sites. Julien Micheli, product manager at Haulotte, said: “The product works with no emiss
  • Self-climbing formwork solution for bridge pylons
    February 27, 2012
    Harsco Infrastructure has provided self-climbing formwork (SCF), which is helping ensure quick and safe access during the construction of a 320m tall pylon for the world’s longest cable-stayed bridge.