Skip to main content

Alsina’s Alsipercha system has a handle on workers at risk of falling

Alsipercha is a “personal fall arrest system” from Spanish firm Alsina Group and consists of a steel body and a self-retractable lifeline. The retractable lifeline locks when an acceleration occurs during a fall, similar to the seatbelt of a car. It provides complete freedom of movement - 360º - by rotating on its axis, allowing the worker to safely perform operations at height. The Alsipercha is composed of six elements: the system itself, a retractable device, a shock-absorbing device, a retractabl
May 23, 2016 Read time: 2 mins
Employees are in safe hand with Alsipercha
Alsipercha is a “personal fall arrest system” from Spanish firm 8425 Alsina Group and consists of a steel body and a self-retractable lifeline.

The retractable lifeline locks when an acceleration occurs during a fall, similar to the seatbelt of a car. It provides complete freedom of movement - 360º - by rotating on its axis, allowing the worker to safely perform operations at height.
 
The Alsipercha is composed of six elements: the system itself, a retractable device, a shock-absorbing device, a retractable device protector, a conical tube and a sling and  hook.

For construction work, it allows the safe placement of boards, guardrails, edging formwork and in formwork assembly where there is high risk of falling. However, the company says that it is also a useful for logistics and other industry operations where there is high risk of falling.

Alsipercha has a wide range of accessories to allow the wearer to work secured while covering the entire work surface and to adapt to many situations. The metal structure in the form of an inverted "L" provides an anchor point up to 6.5m (80kg) and the rail system (ATEX) allows a pendulum effect "O".

In the logistics industry, it allows the safe loading and unloading of trucks and maintenance of platforms.

Alsina Group, based in Barcelona, employs 600 people for the design, manufacture, selling and rental of formwork for concrete structures.

For more information on companies in this article

Related Content

  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b