Skip to main content

Zealand to gain from Fehmarn Belt tunnel

The number of commuters crossing the Fehmarn Belt, a Baltic Sea strait that separates a German island and a Danish island, could reach 1.2 million by 2030, notes a new report.
By David Arminas July 2, 2021 Read time: 2 mins
A 18km trench in the seabed, up to 60m wide and 16m deep, will accommodate the immersed tunnel elements (image copyright Femern A/S)

Denmark’s Zealand region could see a 200 per cent rise in annual visits by the time the Fehmarn Belt link is open in 2030.

Today, there are around 400,000 commutes by ferry across the Fehmarn Belt, a strait between the German island of Fehmarn and the Danish island of Lolland.

By taking into consideration the effect of similar large bridge and tunnel projects, commuting through the 18km immersed road and rail tunnel could jump to over 1.2 million annually, according to a report compiled by HBS Economic on behalf of Danish business development consultancy Erhvervshus Sjælland and the Zealand regional council.

Earlier this year, a tender was launched for electrical installation within the planned €7 billion project. As part of what will be a contract worth around €750 million (US$913 million), the winner must set up a renewable energy centre for its work. The tender will close and a decision made by the end of the year for work to start in 2022 or 2023.

Femern A/S, which is planning, building and which will operate the fixed link is part of Sund & Bælt Holding - 100 per cent owned by the Danish Ministry of Transport. Sund & Bælt Holding is also responsible for the fixed link across Storebælt.

According to Femern, a trench up to 60m wide, 16m deep and 18km long will be dug in the seabed. Around 19 million cubic metres of stone and sand will be excavated and used to establish 3km² of new natural areas on Lolland and, to a lesser extent, on Fehmarn.

An animation of the tunnel construction is available on YouTube.

For more information on companies in this article

Related Content

  • Denmark set to appoint preferred bidder for Fehmarnbelt link
    March 14, 2016
    The Danish political parties behind the Fehmarnbelt link have mandated Femern A/S to appoint preferred bidders for the main tunnel work in order to enter into conditional contracts no later than mid-May. Femern A/S is the Danish government-owned company managing the Fehmarn Belt immersed tunnel project between Denmark and Germany. The project was approved by the Danish parliament in April last year. It is supposed to be built, owned - apart from the German land works - and operated by Femern A/S, a su
  • EU launches investigation into Fehmarn Belt financing model
    June 21, 2019
    The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Doka wins Fehmarnbelt Tunnel formwork deal
    November 17, 2022
    When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.