Skip to main content

Zambia road contract for Irish firm

A US$11.8 million contract in Zambia will be handled by Irish engineering consultant Nicholas O'Dwyer. The firm has the contract for design review, financial and technical supervision of a major road project. The 350km dual carriagway will connect Lusaka with Ndola and pass through Kite. This is expected to cost $1.2 billion, while construction will take 36 months. Building the dual carriageway will provide better transport to and from a number of the country’s copper mines, which are important for the Zamb
June 18, 2018 Read time: 1 min

A US$11.8 million contract in Zambia will be handled by Irish engineering consultant Nicholas O'Dwyer. The firm has the contract for design review, financial and technical supervision of a major road project. The 350km dual carriagway will connect Lusaka with Ndola and pass through Kite. This is expected to cost $1.2 billion, while construction will take 36 months. Building the dual carriageway will provide better transport to and from a number of the country’s copper mines, which are important for the Zambian economy.

Related Content

  • Feasibility study for Romanian road link project
    February 13, 2015
    The Romanian National Company for Highways (CNADNR) is commissioning a study for an important new road link. The proposed connection would link the existing Sibiu bypass with the Pitesti bypass. Italian firm Spea Ingineria Europea and Romanian firm Tecnic Consulting Engineering have formed a joint venture to handle the €6.5 million feasibility study into the project. The consultancy work is expected to take 17 months to complete. The proposed link would stretch some 120km and is expected to cost around €1.6
  • UK road investment strategy questioned
    July 31, 2023
    A report from the House of Commons Transport Committee recommended cancellation of some major new projects such as the Stonehenge Tunnel and the Lower Thames Crossing.
  • Zimbabwe's road plan
    February 24, 2012
    Zimbabwe looks set to receive a US$1.3 billion loan from the Development Bank of South Africa (DBSA).
  • Pakistan highway project due for completion
    July 17, 2017
    A new six lane highway connection in Pakistan is expected to be complete in 36 months. A Chinese firm, China State Construction Engineering, is to handle the project for the 393km highway, which runs from Sukkur to Multan. Financing for the project is being provided by the Chinese Government and the work is expected to cost close to US$2.8 billion in all. The highway will form a key link in the China-Pakistan Economic Corridor (CPEC), which will help improve transport across Asia. The highway project is com