Skip to main content

Year-end completion for Nigeria’s 44km concrete Obajana–Kabba road

Nigeria’s longest concrete road should be open by the end of the year, according to AG-Dangot, contractor on the project. Around 33km of earthworks and 23km of pavement have been completed for the 44km Obajana–Kabba project in Kogi state, according to Ashif Juma, managing director of AG-Dangote. Nigerian media reported that Juma also urged all of Nigeria’s governments and councils to switch from asphalt to concrete road construction because concrete requires less maintenance. To this end, the Obajana-Kabba
April 12, 2018 Read time: 1 min

Nigeria’s longest concrete road should be open by the end of the year, according to AG-Dangot, contractor on the project.

Around 33km of earthworks and 23km of pavement have been completed for the 44km Obajana–Kabba project in Kogi state, according to Ashif Juma, managing director of AG-Dangote.

Nigerian media reported that Juma also urged all of Nigeria’s governments and councils to switch from asphalt to concrete road construction because concrete requires less maintenance. To this end, the Obajana-Kabba rigid pavement road project is part of the Dangote’s Group’s corporate social responsibility strategy, he said.

“Concrete road last longer than asphalt roads and do not have potholes. It does not require frequent maintenance as asphalt roads [do]. It saves fuel for motorists and protects tyres from wear and tear,” a company statement said.

Related Content

  • A macro website launched for microsurfacing processes
    October 9, 2018
    RoadResource.org as a go-to website for surfacing information is now live When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three major US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the opening day,” says the 51-year-old chartere
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Attitude is key to sustainability, says Volvo CE’s Thomas Bitter
    June 27, 2018
    Whether you are in the global Volvo Ocean Race or working on-site locally, sustainability is about attitude as much as technology. David Arminas reports. Technology, sustainability and safety. We ignore these often related themes at our peril. This was the key point made by Volvo Group chief executive Martin Lundstedt during his brief opening presentation at the start of the Building Tomorrow Conference in Spain last October. The conference took place within the harbour of Alicante that was bustling wit
  • Australia’s road safety problems are a cause for concern
    January 23, 2019
    The Australian Road Research Board (ARRB) has highlighted key problems with road safety. According to the ARRB, these issues must be addressed if Australia’s road casualty rate is to be reduced. Road death tolls are being reduced as he latest results show, but more work needs to be done. According to the ARRB, the road death tolls in Victoria dropped 20% for 2018 when compared with the previous year. This is a major improvement, showing the gains made by Victoria’s road agency VicRoads and the state’s Tr