Skip to main content

Year-end completion for Nigeria’s 44km concrete Obajana–Kabba road

Nigeria’s longest concrete road should be open by the end of the year, according to AG-Dangot, contractor on the project. Around 33km of earthworks and 23km of pavement have been completed for the 44km Obajana–Kabba project in Kogi state, according to Ashif Juma, managing director of AG-Dangote. Nigerian media reported that Juma also urged all of Nigeria’s governments and councils to switch from asphalt to concrete road construction because concrete requires less maintenance. To this end, the Obajana-Kabba
April 12, 2018 Read time: 1 min

Nigeria’s longest concrete road should be open by the end of the year, according to AG-Dangot, contractor on the project.

Around 33km of earthworks and 23km of pavement have been completed for the 44km Obajana–Kabba project in Kogi state, according to Ashif Juma, managing director of AG-Dangote.

Nigerian media reported that Juma also urged all of Nigeria’s governments and councils to switch from asphalt to concrete road construction because concrete requires less maintenance. To this end, the Obajana-Kabba rigid pavement road project is part of the Dangote’s Group’s corporate social responsibility strategy, he said.

“Concrete road last longer than asphalt roads and do not have potholes. It does not require frequent maintenance as asphalt roads [do]. It saves fuel for motorists and protects tyres from wear and tear,” a company statement said.

Related Content

  • Automated testing is safer, cheaper and more thorough
    December 12, 2018
    Automated testing is improving safety during paving and saving on testing costs. But it could also help reduce long-term maintenance costs too - Kristina Smith writes Testing pavements as they are laid can be a hazardous activity. The technician may be on their hands and knees, far behind the main gang, or reaching inside the hopper to measure the temperature of the hot mix or dodging rollers to take density readings.
  • A new event is preparing the asphalt industry for tomorrow’s world
    September 11, 2018
    An inaugural event for the European bitumen industry urged attendees to look to the future - Kristina Smith reports What will tomorrow’s roads look like? Will lanes be narrower, will the road charge vehicles as they drive on them, will they collect data, will they be self-cleaning and de-polluting? All these questions and more were pondered at a two-day conference in Berlin, entitled ‘Preparing the asphalt industry for the future’. It was the first such event for Eurasphalt & Eurobitume (E&E), and set a
  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • Self-healing roads, slippery roads and slimmer roads
    November 24, 2017
    This month’s bitumen technology pages bring you self-healing roads, slippery roads and slimmer roads and explains why one UK contractor has started manufacturing its own polymer modified bitumen - Kristina Smith reports. Professor Erik Schlangen, who heads up experimental micromechanics at the Delft University of Technology is receiving calls from all round the world these days. And it is hardly surprising because he and his team have invented a great new technology: asphalt that heals itself.