Skip to main content

Work underway on key Vietnam expressway project

Construction work is underway on Vietnam’s key Trung Luong-My Thuan expressway project. The rate of construction has been speeded up for the section located in Tien Giang Province. Funding issues had previously slowed the work. However a complete financing package has yet to be secured.
August 8, 2019 Read time: 1 min

Construction work is underway on Vietnam’s key Trung Luong-My Thuan expressway project. The rate of construction has been speeded up for the section located in Tien Giang Province. Funding issues had previously slowed the work. However a complete financing package has yet to be secured.

Related Content

  • Work on Bosnian link accelerates
    February 27, 2012
    In Bosnia delays have affected the construction work on the country's key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence.
  • Ethiopia’s new tolled highway opens
    June 21, 2019
    Ethiopia is now benefiting from a new tolled route, improving transport between Dire Dawa and Dewele.
  • Cintra leads mega-toll project
    July 5, 2012
    A TEAM of private companies led by Spanish toll road operator Cintra has secured its financing for the Texas, USbased mega-toll project, the North Tarrant Express. The project The US$2 billion (€1.4 billion) project will rebuild existing lanes along Interstate 820 and portions of SH 183, and add new managed lanes as well, with construction expected to begin in late 2010.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during