Skip to main content

Work starting on sections of Vietnam’s North-South Expressway

Work is starting shortly on sections of Vietnam’s North-South Expressway.
By MJ Woof August 25, 2020 Read time: 1 min
Work is underway on stretches of Vietnam’s North-South Expressway project – image courtesy © Fckncg, Dreamstime.com

Work is due to commence shortly on key sections of Vietnam’s massive North-South Expressway project. The construction work will start on three sub-projects of the route’s Eastern cluster by the end of September 2020.

Included in these three sub-projects are 13 civil work packages. The works are for the stretches between Phan Thiet and Dau Giay, Mai Son and National Highway No 45 and Vinh Hao and Phan Thiet. There are 11 sub projects in all for the Eastern Cluster of the North-South Expressway project, which extends 654km and has an estimated value of US$5.06 billion.

Meanwhile, the tender process is also underway for a further five sub-projects, with the winners due to be selected in December 2020.

Related Content

  • Work starting on Zimbabwe’s important highway
    November 4, 2019
    Construction work is finally getting underway on Zimbabwe’s important A4 Harare to Beitbridge highway project.
  • Vietnam-Cambodia expressway link gets approval
    May 5, 2017
    Construction of a new expressway is intended to improve the connection between Cambodia’s capital Phnom Penh and Vietnam’s capital, Ho Chi Minh City. This is the product of discussions between the Vietnamese and Cambodian governments. The project is expected to cost US$650 million and the new link will feature three lanes in either direction and will run alongside the existing Highway 22 in Vietnam and Highway 1 in Cambodia. The new route will feature a maximum speed of 120km/h and will stretch for 65km in
  • New highway tender for Chile’s capital
    July 26, 2013
    The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an ope
  • New Vietnamese expressway projects
    April 18, 2023
    New Vietnamese expressway projects are planned.