Skip to main content

Virginia state issues RFP for $2.1 billion Interstate 66 toll expansion

The Virginia Department of Transportation (VDOT) has issued a draft request for proposals (RFP) for the US$2.1 billion Interstate 66 tolled expansion project. Work under a 40-50-year public-private partnership is expected to include construction of 46km of lanes.
December 23, 2015 Read time: 3 mins

The 5131 Virginia Department of Transportation (VDOT) has issued a draft request for proposals (RFP) for the US$2.1 billion Interstate 66 tolled expansion project.

Work under a 40-50-year public-private partnership is expected to include construction of 46km of lanes.

Toll lanes will be free for vehicles with three or more people in them (HOV-3), and, like the existing 95 and 495 Express Lanes, toll prices will increase or decrease based on the number of vehicles using the lanes.

A Request for Information issued by the VDOT in 2013 had 19 private sector responses, with respondents believing a P-3 approach benefit all parties in any contract, although there were concerns over the financial viability of the project. Total capital cost would be in the region of $2.3-3.3 billion of which private sector investment would likely be up to $1.1 billion, the document noted. Annual maintenance costs would probably be between $27-33 million.

A Virginia Commonwealth Transportation Board document issued in January this year – I-66 Corridor Briefing Outside the Beltway – noted the preferred option is a 40-50-year public-private partnership.

Work includes converting an existing High-Occupancy-Vehicle lane into an express lane and adding one more express lane. Non-HOV cars would be congestion-tolled on these two lanes: when congestion increases, toll prices rise to regulate the number of drivers wanting to enter the lanes. Three non-tolled regular lanes would be open to all traffic. There will also be “rapid bus service and other multimodal improvements”, including park-and-ride lots and “transportation demand management”, according to the document.

This past October, the VDOT shortlisted 13 consortia for three types of toll concession public-private finance contract options: design-build-finance-operate-maintain, design-build-operate-maintain, and design-build-alternative technical concepts.

Shortlisted companies in various consortia groupings include Skanska, Archer Western, Transurban, Ferrovial Agroman, Infrared, Fluor, Flatiron, Dragados, Shikun & Binui and Shirley.

In a recent briefing, VDOT Commissioner Charlie Kilpatrick said the VDOT expects to select a private sector partner in the fall of 2016 with financial close scheduled for spring of 2017 and construction to start soon after.

All of the revenues raised from the tolls will finance transportation improvements in the corridor. Estimated toll revenue in 2018 is $18 million. But, should traffic not flow better within five years, toll revenues will be used to widen a section of the I-66 eastbound.

To view the I-66 Corridor Briefing Outside the Beltway document, click here.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal http://www.ctb.virginia.gov/resources/2015/jan/pres/Presentation_Agenda_Item_9.pdf false http://www.ctb.virginia.gov/resources/2015/jan/pres/Presentation_Agenda_Item_9.pdf false false%>

The project is separate from, but related to, plans for I-66 inside the Beltway, where VDOT wants a high occupancy or rush-hour toll plan by 2017. Vehicles with two people (HOV-2) are likely to travel for free until the lanes switch to an HOV-3 model – three occupants - around 2020.

For more information on companies in this article

Related Content

  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Louisiana bridge contract awarded to joint venture
    August 2, 2023
    A key Louisiana bridge contract has been awarded to a joint venture.