Skip to main content

Virginia cancels Ferrovial road contract for US460 construction

The Transport Department of the State of Virginia in the US plans to cancel a contract worth an estimated US$1.12 billion for road construction awarded to Spanish firm Ferrovial. The deal ends 15 June and the two parties are negotiating compensation terms for Ferrovial which won the contract in October 2012 for US-460. . Work was to begin in 2014 and finish in 2018 but no construction has taken place. The road, awarded in consortium with American Infrastructure, was to be 88.5km and run between the c
May 6, 2015 Read time: 1 min
RSSThe 5131 Virginia Department of Transportation in the US plans to cancel a contract worth an estimated US$1.12 billion for road construction awarded to Spanish firm 2717 Ferrovial.

The deal ends 15 June and the two parties are negotiating compensation terms for Ferrovial which won the contract in October 2012 for US-460. Work was to begin in 2014 and finish in 2018 but no construction has taken place.

The road, awarded in consortium with American Infrastructure, was to be 88.5km and run between the cities of Petersburg and Suffolk

Meanwhile, for winter maintenance operations between October 2014 and March this year, more than US$1 billion was spent by 23 US states. According to the American Association of State Highway and Transportation, more than 6.07 million litres of de-icer and 544,000tonnes of salt were used by the state of Massachusetts alone.

For more information on companies in this article

Related Content

  • Sarajevo Ring Road works set to finish in October 2012
    July 27, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag AG. The completed Ring Road will be part of the future Corridor Vc motorway.
  • Technology helps earth moving and paving
    August 18, 2014
    Located in Meeker, Colorado and serving the area for air transportation is Meeker Airport, a C-II general aviation airport. The FAA designation of C-II means the airport can accommodate aircraft with wingspan of less than 24m. Runway 3-21 at the Rio Blanco county-owned Meeker Airport had reached a point of wear and deterioration that required full reconstruction and upgrades to remain compliant with the FAA’s C-II requirements.
  • Funds agreed, further funds sought for Paraguay road and bridge projects
    May 13, 2014
    Paraguay's Ministry of Public Works and Communications (MOPC) has requested a US$289.45 million donation from the Mercosur Structural Convergence Fund (Focem) for the second stage of the Costanera road project (Costanera II) and a second bridge connecting the country to Brazil. Of this total, around $117.44 million will be allocated to works on Costanera II. This is higher than the initial estimate of $100 million, with 60% covered by Focem and 40% financed by a local counterpart. The bridge, which will req
  • Key highway project for Norway
    January 9, 2014
    The Norwegian Public Roads Administration, Statens Vegvesen , has awarded contracts for the E6 highway to Implenia and KA Austad and for the E18 south of capital Oslo. The E6 contract relates to the stretch connecting Vinstra and Sjoa in Gudbrandsdalen and is worth some €185.71 million. The construction work is now commencing and will take until October 2016 to complete. The project is for 16km of the E6 however it will include tunnel construction work. Hard, competent rock conditions mean that drill and bl