Skip to main content

Vinci picks up Lafonataine Tunnel work

The renovated tunnel is expected to have about 40 years of life.
By David Arminas August 12, 2020 Read time: 3 mins
A salty dog: seawater has caused issues with the 53-year-old Montreal tunnel (image courtesy of Vinci)

The Canadian province of Quebec has awarded a Vinci consortium a renovation contract for the 1.4km tunnel section of Montreal’s Louis-Hippolyte Lafontaine Bridge–Tunnel complex.

Under the a US$883.34 million design, build, finance contract, Renoveau La Fontaine - comprising of Eurovia Infra, Dodin Campenon Bernard and Pomerleau – will start design work with construction to start in 2022.

The town of Boucherville will allocate around 830,000 while Montreal city is investing $2.25 million and the federal government is putting in around $321 million.

In December 2018, Quebec’s Transport Ministry shortlisted Renoveau La Fontaine along with the consortium Relais St-Laurent which comprised SNC-Lavalin Grands Projets, EBC and SNC-Lavalin Capital.

The tunnel is part of the greater Louis-Hippolyte Lafontaine Bridge–Tunnel complex that runs over and under the Saint Lawrence River to connect the Montreal borough of Mercier–Hochelaga-Maisonneuve with the south shore of the river at Longueuil. Named after Lower Canada political reformer Louis-Hippolyte Lafontaine, the seven section 1.4km immersed tube structure carries the Autoroute 25 expressway and passes beneath the main shipping channel. The bridge-tunnel has about 120,000 daily crossings, of which 13% are trucks.

The renovated tunnel is expected to have about 40 years of life. Also, concrete slabs of Highway 25 on the Montreal side of the tunnel will be replaced. On the south side, a third lane of traffic will be added by turning the safety breakdown lanes on Highway 20 into active vehicle lanes -  much of them converted into reserved bus lanes. The consortium will be responsible for maintaining traffic control measures.

According to Vinci, the consortium’s financing package includes a bank loan from a syndicate of five Canadian banks and a Japanese bank.

Tunnel work will include installation of fire protection facings, landscaping and architectural finishes, modernising all electrical, electromechanical and supervisory infrastructure, as well as deploying new technologies to increase operator and user safety - fire safety equipment and smoke evacuation systems.

Associated road works include access roads, widening the A20 motorway with the addition of a new bus and car-sharing lane, as well rehabilitating 25km of pavement on the A25, A20and an interchange.

The tunnel was opened in 1967 – the year that marked 100 years of Canada as a country. It took four years to construct but the past half century of salt-water seepage into the concrete has eroded the structure’s base, according to media reports. Replacing the tunnel with another tunnel or a bridge was studied, but the idea was dropped because of the estimated price tag of around US$2.6 billion.

Each tunnel section is 110m long, 37m wide and 8m high. The tunnel was built with sections prefabricated in dry dock and then sunk 24m below the surface of the water. The adjoining bridge section is 400m long and at 1.8km in total the structure is the longest bridge-tunnel in Canada.

 

For more information on companies in this article

Related Content

  • Canadian air
    February 8, 2012
    Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
  • Ferrovial loses control of Canada’s 407 Express Toll Road
    August 27, 2019
    Ferrovial has lost control of the 407 International highway in Canada, one of the Spanish group's star assets. The Supreme Court in the province of Ontario has ruled in favour of co-shareholder pension fund Canada Pension Plan Investment Board to buy another stake - 10.01% - in the highway. The shares are up for sale by another shareholder, Montreal-based global infrastructure engineering firm SNC-Lavalin. The court denied Ferrovial, which already has the largest shareholding at 43% in the highway, th
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.