Skip to main content

Vinci picks up Lafonataine Tunnel work

The renovated tunnel is expected to have about 40 years of life.
By David Arminas August 12, 2020 Read time: 3 mins
A salty dog: seawater has caused issues with the 53-year-old Montreal tunnel (image courtesy of Vinci)

The Canadian province of Quebec has awarded a Vinci consortium a renovation contract for the 1.4km tunnel section of Montreal’s Louis-Hippolyte Lafontaine Bridge–Tunnel complex.

Under the a US$883.34 million design, build, finance contract, Renoveau La Fontaine - comprising of Eurovia Infra, Dodin Campenon Bernard and Pomerleau – will start design work with construction to start in 2022.

The town of Boucherville will allocate around 830,000 while Montreal city is investing $2.25 million and the federal government is putting in around $321 million.

In December 2018, Quebec’s Transport Ministry shortlisted Renoveau La Fontaine along with the consortium Relais St-Laurent which comprised SNC-Lavalin Grands Projets, EBC and SNC-Lavalin Capital.

The tunnel is part of the greater Louis-Hippolyte Lafontaine Bridge–Tunnel complex that runs over and under the Saint Lawrence River to connect the Montreal borough of Mercier–Hochelaga-Maisonneuve with the south shore of the river at Longueuil. Named after Lower Canada political reformer Louis-Hippolyte Lafontaine, the seven section 1.4km immersed tube structure carries the Autoroute 25 expressway and passes beneath the main shipping channel. The bridge-tunnel has about 120,000 daily crossings, of which 13% are trucks.

The renovated tunnel is expected to have about 40 years of life. Also, concrete slabs of Highway 25 on the Montreal side of the tunnel will be replaced. On the south side, a third lane of traffic will be added by turning the safety breakdown lanes on Highway 20 into active vehicle lanes -  much of them converted into reserved bus lanes. The consortium will be responsible for maintaining traffic control measures.

According to Vinci, the consortium’s financing package includes a bank loan from a syndicate of five Canadian banks and a Japanese bank.

Tunnel work will include installation of fire protection facings, landscaping and architectural finishes, modernising all electrical, electromechanical and supervisory infrastructure, as well as deploying new technologies to increase operator and user safety - fire safety equipment and smoke evacuation systems.

Associated road works include access roads, widening the A20 motorway with the addition of a new bus and car-sharing lane, as well rehabilitating 25km of pavement on the A25, A20and an interchange.

The tunnel was opened in 1967 – the year that marked 100 years of Canada as a country. It took four years to construct but the past half century of salt-water seepage into the concrete has eroded the structure’s base, according to media reports. Replacing the tunnel with another tunnel or a bridge was studied, but the idea was dropped because of the estimated price tag of around US$2.6 billion.

Each tunnel section is 110m long, 37m wide and 8m high. The tunnel was built with sections prefabricated in dry dock and then sunk 24m below the surface of the water. The adjoining bridge section is 400m long and at 1.8km in total the structure is the longest bridge-tunnel in Canada.

 

For more information on companies in this article

Related Content

  • Mountain View Partners to start on Calgary’s Southwest Ring Road
    July 19, 2016
    Preliminary utilities work is set to begin in September on the last section a ring road around the Canadian city of Calgary. The Calgary Herald newspaper quoted the Alberta provincial infrastructure and transportation minister Brian Mason saying that the project is on schedule. He said “everything is going as planned … It’s important that we keep on top of this and it’s important that we keep it moving forward and so far we’re doing just that.” The public-private-partnership project for the southwest
  • Colombia’s longest bridge part of major project
    September 14, 2016
    Construction activity is underway on a number of key transport infrastructure projects in Colombia. A major bridge project spanning the Magdalena River is currently under construction close to the city of Barranquilla in the north of Colombia. The Pumarejo Bridge was commissioned by Instituto Nacional de Vías (INVIAS) and is being built by a consortium. Featuring a cable-stayed design, the bridge will be 2.28km in length, with three lanes for vehicles, as well as a pedestrian area and a cycle track in b
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect