Skip to main content

Vinci picks up Lafonataine Tunnel work

The renovated tunnel is expected to have about 40 years of life.
By David Arminas August 12, 2020 Read time: 3 mins
A salty dog: seawater has caused issues with the 53-year-old Montreal tunnel (image courtesy of Vinci)

The Canadian province of Quebec has awarded a Vinci consortium a renovation contract for the 1.4km tunnel section of Montreal’s Louis-Hippolyte Lafontaine Bridge–Tunnel complex.

Under the a US$883.34 million design, build, finance contract, Renoveau La Fontaine - comprising of Eurovia Infra, Dodin Campenon Bernard and Pomerleau – will start design work with construction to start in 2022.

The town of Boucherville will allocate around 830,000 while Montreal city is investing $2.25 million and the federal government is putting in around $321 million.

In December 2018, Quebec’s Transport Ministry shortlisted Renoveau La Fontaine along with the consortium Relais St-Laurent which comprised SNC-Lavalin Grands Projets, EBC and SNC-Lavalin Capital.

The tunnel is part of the greater Louis-Hippolyte Lafontaine Bridge–Tunnel complex that runs over and under the Saint Lawrence River to connect the Montreal borough of Mercier–Hochelaga-Maisonneuve with the south shore of the river at Longueuil. Named after Lower Canada political reformer Louis-Hippolyte Lafontaine, the seven section 1.4km immersed tube structure carries the Autoroute 25 expressway and passes beneath the main shipping channel. The bridge-tunnel has about 120,000 daily crossings, of which 13% are trucks.

The renovated tunnel is expected to have about 40 years of life. Also, concrete slabs of Highway 25 on the Montreal side of the tunnel will be replaced. On the south side, a third lane of traffic will be added by turning the safety breakdown lanes on Highway 20 into active vehicle lanes -  much of them converted into reserved bus lanes. The consortium will be responsible for maintaining traffic control measures.

According to Vinci, the consortium’s financing package includes a bank loan from a syndicate of five Canadian banks and a Japanese bank.

Tunnel work will include installation of fire protection facings, landscaping and architectural finishes, modernising all electrical, electromechanical and supervisory infrastructure, as well as deploying new technologies to increase operator and user safety - fire safety equipment and smoke evacuation systems.

Associated road works include access roads, widening the A20 motorway with the addition of a new bus and car-sharing lane, as well rehabilitating 25km of pavement on the A25, A20and an interchange.

The tunnel was opened in 1967 – the year that marked 100 years of Canada as a country. It took four years to construct but the past half century of salt-water seepage into the concrete has eroded the structure’s base, according to media reports. Replacing the tunnel with another tunnel or a bridge was studied, but the idea was dropped because of the estimated price tag of around US$2.6 billion.

Each tunnel section is 110m long, 37m wide and 8m high. The tunnel was built with sections prefabricated in dry dock and then sunk 24m below the surface of the water. The adjoining bridge section is 400m long and at 1.8km in total the structure is the longest bridge-tunnel in Canada.

 

For more information on companies in this article

Related Content

  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u
  • Empresas ICA and CDPQ enter partnership for road projects
    April 17, 2015
    Mexican construction company Empresas ICA has entered a partnership with Canadian investment company CDPQ to carry out joint road projects in Mexico. Under the arrangement, subject to Mexican government approval, ICA holds a 51% interest in the partnership and CDPQ will pay US$197.17 million to ICA for its 49% equity share of the new business. The companies are planning four projects: the Mayab motorway, the Rio-Verde-Ciudad Valles motorway, the La Piedad bypass and the Acapulco tunnel. ICA carries
  • Construction consortium conquers in contract for Moscow-St Petersburg highway section
    May 13, 2014
    A consortium has won a key construction and concession contract in Russia for a stretch of the Moscow-St Petersburg highway. The construction consortium comprises contractor Vinci and Russian Bank VTB. The deal involves around US$1.7 billion of public financing for the construction phase and some $983 million for operation for the period of the contract. The concession package involves construction of the highway section, as well as operation for a 24 year period. The construction work will be carried out b