Skip to main content

Vinci picks up Lafonataine Tunnel work

The renovated tunnel is expected to have about 40 years of life.
By David Arminas August 12, 2020 Read time: 3 mins
A salty dog: seawater has caused issues with the 53-year-old Montreal tunnel (image courtesy of Vinci)

The Canadian province of Quebec has awarded a Vinci consortium a renovation contract for the 1.4km tunnel section of Montreal’s Louis-Hippolyte Lafontaine Bridge–Tunnel complex.

Under the a US$883.34 million design, build, finance contract, Renoveau La Fontaine - comprising of Eurovia Infra, Dodin Campenon Bernard and Pomerleau – will start design work with construction to start in 2022.

The town of Boucherville will allocate around 830,000 while Montreal city is investing $2.25 million and the federal government is putting in around $321 million.

In December 2018, Quebec’s Transport Ministry shortlisted Renoveau La Fontaine along with the consortium Relais St-Laurent which comprised SNC-Lavalin Grands Projets, EBC and SNC-Lavalin Capital.

The tunnel is part of the greater Louis-Hippolyte Lafontaine Bridge–Tunnel complex that runs over and under the Saint Lawrence River to connect the Montreal borough of Mercier–Hochelaga-Maisonneuve with the south shore of the river at Longueuil. Named after Lower Canada political reformer Louis-Hippolyte Lafontaine, the seven section 1.4km immersed tube structure carries the Autoroute 25 expressway and passes beneath the main shipping channel. The bridge-tunnel has about 120,000 daily crossings, of which 13% are trucks.

The renovated tunnel is expected to have about 40 years of life. Also, concrete slabs of Highway 25 on the Montreal side of the tunnel will be replaced. On the south side, a third lane of traffic will be added by turning the safety breakdown lanes on Highway 20 into active vehicle lanes -  much of them converted into reserved bus lanes. The consortium will be responsible for maintaining traffic control measures.

According to Vinci, the consortium’s financing package includes a bank loan from a syndicate of five Canadian banks and a Japanese bank.

Tunnel work will include installation of fire protection facings, landscaping and architectural finishes, modernising all electrical, electromechanical and supervisory infrastructure, as well as deploying new technologies to increase operator and user safety - fire safety equipment and smoke evacuation systems.

Associated road works include access roads, widening the A20 motorway with the addition of a new bus and car-sharing lane, as well rehabilitating 25km of pavement on the A25, A20and an interchange.

The tunnel was opened in 1967 – the year that marked 100 years of Canada as a country. It took four years to construct but the past half century of salt-water seepage into the concrete has eroded the structure’s base, according to media reports. Replacing the tunnel with another tunnel or a bridge was studied, but the idea was dropped because of the estimated price tag of around US$2.6 billion.

Each tunnel section is 110m long, 37m wide and 8m high. The tunnel was built with sections prefabricated in dry dock and then sunk 24m below the surface of the water. The adjoining bridge section is 400m long and at 1.8km in total the structure is the longest bridge-tunnel in Canada.

 

For more information on companies in this article

Related Content

  • Curved girders for the Gaasperdammerweg A9 section in Amsterdam
    May 22, 2018
    Dutch authorities recently needed to add traffic lanes to two flyovers at the Holendrecht junction on the Gaasperdammerweg section of the A9 motorway in Amsterdam It was in November 2014 that the Directorate-General for Public Works and Water Management of the Netherlands Rijkswaterstaat awarded the A9 Gaasperdammerweg public-private-partnership project to IXAS Zuid-Oost, a consortium consisting of Ballast Nedam, Fluor, Heijmans and 3i Infrastructure. The A9 Gaasperdammerweg project is the third section
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.