Skip to main content

Vietnam: work on Phuoc Khanh cable stayed bridge to begin in August

Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June. The contract was signed by the Vietnam Expressway Corporation and a consortium made up of Japanese contractor Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4). The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will a
June 22, 2015 Read time: 2 mins
Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June.

The contract was signed by the 3177 Vietnam Expressway Corporation and a consortium made up of Japanese contractor 2714 Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4).

The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will also connect the seaports of Cai Mep-Thi Vai and Hiep Phuoc with the planned Long Thanh International Airport, and shorten travel times from Long An to Dong Nai and Ba Ria-Vung Tau.

Stage one alone is expected to cost around US$1.44 billion. Around $337 million will come from the Government of Vietnam, $635 million from Japan and around $636 million from the Asia Development Bank.

Initial investment capital is expected to be around $162 million for the four-lane 21.7m-wide bridge that will span the Long Tau River. Completion is scheduled for 2018, according to the Vietnam News Agency.

For more information on companies in this article

Related Content

  • Vietnam pushes ahead with road programme
    February 29, 2012
    Plans are in hand for a groundbreaking ceremony on Vietnam's Ben Luc-Long Than expressway during July-September 2011.
  • Greenlight for Vietnam’s Cat Lai Bridge in 2020
    September 4, 2019
    An agreement has been reached in Vietnam for construction of a bridge over the Dong Nai River close to Ho Chi Minh City. The proposed 4.5km, six-lane cable stayed structure – the Cat Lai Bridge - could cost as much as US$268 million. It would replace the Cat Lai ferry service that runs between Nhon Trach District of Dong Nai Province and District 2 of Ho Chi Minh City. The bridge would also become a major route to the international airport, according to local media. The ferry service carries on averag
  • Japanese firm building Vietnam link
    February 24, 2012
    Japanese firm Sumitomo Mitsui is handling a US$52 million contract to build a section of the planned elevated expressway in Hanoi.
  • Vietnam highway project receiving South Korean funding?
    November 3, 2017
    Vietnam’s Belt Road Three project is being planned at present, with some of the financing still being sought. The route will run between Tan Van District and Nhon Trach District, crossing the Dong Nai River. The project is expected to cost US$2.46 billion to construct and will feature four lanes initially, with additional lanes being built in future phases. The 89.3km route has been approved and runs through the provinces of Binh Duong, Dong Nai and Long An, as well as through the outskirts of Ho Chi Minh