Skip to main content

Vietnam ponders PPP for Ring Road 4 work in Ho Chi Minh City area

A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study. The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by Cuu Long Corporation. The government is considering offering the work as a public-private partnership. The road would feature 10 bridges and an overpass at an intersection with National Highway 1. If approved, work could start i
April 24, 2019 Read time: 1 min

 A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study.

The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by 3561 Cuu Long Corporation.

The government is considering offering the work as a public-private partnership.

The road would feature 10 bridges and an overpass at an intersection with National Highway 1.

If approved, work could start in the third quarter of 2020 with completion set for the first quarter of 2023. Capital cost for the project would be recovered within an estimated 19 years and seven months.

For more information on companies in this article

Related Content

  • Tackling India’s road safety will reduce crash rate
    February 19, 2013
    India’s road safety record is the world’s worst but there are plans to tackle the problems. Patrick Smith reports from New Delhi. A speeded up video of a short section of road in the Indian capital Delhi was followed by a question. “How many infringements did you count in that 25-second clip on a typical day in Delhi,” asked Dr Rohit Baluja, a question that brought understandable silence. It equated to hundreds of millions of infringements each year, said Dr Baluja, president, Institute of Road Traffic Educ
  • Slovakia: early 2017 restart for work on the Cebrat Tunnel
    May 27, 2016
    Roman Brecely, Slovakia’s transport minister, has said that construction of the 2km long motorway tunnel Cebrat near Ruzomberok could be resumed at the beginning of 2017. But the cost is expected to increase by around €100 million. He added that the government likely will seek European Union funding. Construction was halted a year ago over concerns about the possibility of landslides and other geological issues. For this reason, the tunnel route may alter and be an additional 1.5km longer. The tunn
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Difficult decisions on projects in the UK
    November 25, 2022
    There are difficult decisions to be made on road projects in the UK.