Skip to main content

Vietnam ponders PPP for Ring Road 4 work in Ho Chi Minh City area

A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study. The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by Cuu Long Corporation. The government is considering offering the work as a public-private partnership. The road would feature 10 bridges and an overpass at an intersection with National Highway 1. If approved, work could start i
April 24, 2019 Read time: 1 min

 A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study.

The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by 3561 Cuu Long Corporation.

The government is considering offering the work as a public-private partnership.

The road would feature 10 bridges and an overpass at an intersection with National Highway 1.

If approved, work could start in the third quarter of 2020 with completion set for the first quarter of 2023. Capital cost for the project would be recovered within an estimated 19 years and seven months.

For more information on companies in this article

Related Content

  • Vietnam’s North-South Expressway project prioritised
    October 20, 2017
    Vietnam’s Ministry of Transport is prioritising the construction of the North-South expressway project. It is seeking the approval of the Vietnamese Government approval to speed up the development of a 713km stretch of the expressway. This particular section of the expressway is phase one of the project and has an estimated construction cost of US$ 5.73 billion. Just over half of the construction cost will be paid for by private investors while Government bonds are expected to pay for the remaining sum. Thi
  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Hanoi considers $55 billion transportation plan
    August 4, 2016
    The Vietnamese capital of Hanoi is looking to build 18 bridges and upgrade several city roads into major urban thoroughfares, according the latest transportation development plan. The People's Committee of Hanoi - the city authority – drafted the US$55 billion plan that focuses on all transportation development from now up to 2030. Contract types under consideration include build-own-operate (BOO), public private partnership (PPP), build-operate-transfer (BOT) and build-transfer, according to a report
  • Colombian concession contracts cause concern
    June 13, 2014
    A report from insurance firm AIG warns that up to half of Colombia's 4G highway concessions could face financial hurdles due to over-estimated predictions of traffic flows. Colombia is at present putting out to tender its fourth generation (4G) concessions, which involve some US$25 billion in investment, reports Business News America. This investment is impressive and is Latin America's biggest move to expand and improve road infrastructure. But while many companies have shown interest and were prequalified