Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • Completion date for stretches of Vietnam’s key project
    October 25, 2018
    The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project. The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaini
  • New bridge projects underway in Vietnam
    December 14, 2015
    Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.
  • Vietnam ring road project
    March 23, 2022
    A key Vietnamese ring road project is planned.
  • Hanoi-Can Tho expressway in Vietnam bond financing evaluation
    April 30, 2013
    The capital planning for the major expansion and upgrading of Hanoi-Can Tho expressway in Vietnam is being considered ahead of a National Assembly evaluation for bond financing. The Ministry of Transport (MoT) has made a proposal for the prime minister to seek the National Assembly's permission to issue government bonds to handle the project. Last month, the MoT presented Document 2738/BGTVT-KHDT to the prime minister to seek capital resources for 17 road sections under the project. The government bonds wil