Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • Key Vietnam road project for HCMC
    August 11, 2023
    A key Vietnam road project is planned for HCMC.
  • Vietnam’s North-South Expressway project prioritised
    October 20, 2017
    Vietnam’s Ministry of Transport is prioritising the construction of the North-South expressway project. It is seeking the approval of the Vietnamese Government approval to speed up the development of a 713km stretch of the expressway. This particular section of the expressway is phase one of the project and has an estimated construction cost of US$ 5.73 billion. Just over half of the construction cost will be paid for by private investors while Government bonds are expected to pay for the remaining sum. Thi
  • Vietnam expressway deal progressing
    June 14, 2018
    Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work f
  • Vietnam’s Dau Giay-Phan Thiet expressway project attracts foreign investors
    August 27, 2013
    At least 15 foreign investors will attend a meeting on the construction of the Dau Giay-Phan Thiet expressway in Vietnam, according to the country’s Ministry of Transport's public-private partnership (PPP) department. The expressway will link the National Highway No 1A in Binh Thuan Province with the under-development HCM City-Long Thanh-Dau Giay expressway. Moreover, one foreign investor will be selected to partner with local company Bitexco Group to build the project. The project is valued at about