Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • Vietnam highway upgrade improving connection with Cambodia
    April 12, 2017
    A highway upgrade in Vietnam will help improve links with neighbouring Cambodia. Work is needed to upgrade the 80km stretch of highway, despite improvements carried out 10 years ago. The route links Ho Chi Minh City with the Cambodian border and is important for trade and transport between the two nations. National Highway 22B is located in of Vietnam’s southeastern province Tay Ninh in Vietnam. The work is expected to cost US$13.23 million and will be carried out in several phases. Work on the first stage
  • Vietnam’s road development programme
    August 17, 2018
    Vietnam is pushing ahead with its road and highway development programme. One crucial project is for the construction of the Ho Chi Minh (HCM) Road project. When complete the route will connect Cao Bang with Ca Mau, with some US$903 million required to finish the work. Around 79% of the 2,744km HCM route is open already, with the road due for completion by 2020. The 98km stretch linking Cam Lo and La Son should be ready in 2019, although work has stopped for the moment on another 289km section of the route
  • Road tunnel for Hanoi's Hoàn Kiếm district
    July 7, 2022
    The project in the Vietnamese capital of Hanoi will have an investment of around US$4.3 million.
  • Key infrastructure projects planned in Vietnam
    May 15, 2013
    The authorities in Vietnam are planning several key infrastructure projects, including the new Cho Chien Bridge and improvements to Provincial Road No15 amongst others. The new Cho Chien Bridge will connect Ben Tre and Vinh Long provinces and this is expected to cost in the region of US$182 million. The project will now be carried out under the PPP model instead of a BOT scheme, which had been envisaged earlier in the planning stage. This change is due to the fact that TLIC will now carry out the project in