Skip to main content

Vietnam bridge, road and highway development projects

Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
June 20, 2018 Read time: 2 mins
Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network.


Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Phan Thiet is being constructed through the build-operate-transfer (BOT) model. The 64km stretch from Ninh Binh to Thanh Hoa will take three years to build and is expected to cost $613 million.

Work is commencing on the $342 million Hoang Cau-Voi Phuc Road project in Hanoi. The project to build the 2.2km stretch includes two overpasses crossing the Nguyen Chi Thanh and Hoang Cau-Voi Phuc crossroads and the Giang Vo-Lang Ha and Hoang Cau-Voi Phuc crossroads.

Designs are currently being assessed for the proposed Can Gio Bridge project by the People's Committee of Ho Chi Minh City (HCMC). The bridge is intended to replace the Binh Kanh ferry link, improving connections to central Hanoi. The new bridge will span Cha River and Soai Rap River, running between Can Gio and Nha Be District and measuring 7.4km in length.

Loans worth nearly $301 million will pay for work on the Trung Luong-My Thuan Expressway project. The four banks are the Bank for Investment and Development of Vietnam (BIDV), the Vietnam Bank for Industry and Trade (VietinBank), the Vietnam Bank for Agriculture and Rural Development (Agribank) and the Vietnam Prosperity Commercial Bank (VPBank). The route is being built by contractor BOT Trung Luong-My Thuan JSC.

Other projects include highways linking La Son District with Cam Lo District, Ba Bot District with Cao Bo District as well as Nha Trang City with My Thuan 2 Bridge and Dau Giay Town.

Related Content

  • Vietnam’s major road works are underway
    January 10, 2023
    Vietnam’s major road works are underway as North-South Expressway stages commence.
  • Vietnam expressway deal gets go ahead
    May 24, 2019
    The Vietnamese Government is giving its approval for the construction of a new tolled expressway connecting Phan Thiet with Dau Giay. The work will be carried out under the PPP model. Building the expressway will improve transport connections to the coastal area around Phan Thiet. Dau Giay is located just to the east of Ho Chi Minh City, so the new link will provide an important transport connection that will boost the economy for Phan Thiet. This deal comes shortly after the announcement of a new 85km str
  • vietnam NH20 upgrades
    November 27, 2012
    A key highway project worth in excess of US$364 million has been revealed in Vietnam. The first package of works for the upgrades to National Highway 20 was awarded by the Ministry of Transport of Vietnam to contractor, Management Board 7. The company will carry out work worth some $220 million, which involves building a 123km road as well as 16 bridges that will link Highway 725 in Lam Dong to Dau Giay Junction in Dong Nai Province. The work is being carried out under a build, operate and transfer type con
  • Vietnam's road expansion
    May 28, 2012
    Vietnam is seeing significant expansion of its highway network at present, with another three major projects now moving forward and much of the financial backing coming from other Asian nations such as South Korea and Japan. A feasibility study is being carried out for the 94km Nghi Son-Bai Vot expressway and this should be complete by October 2010. The project is expected to cost US$1.04 billion and the expressway will have either six or four lanes, based on Transport Engineering Design's study.