Skip to main content

Video: Auckland’s Penlink Highway inches closer to becoming a reality

The final hurdle regarding land settlement has been cleared for Auckland’s ambitious US$274 million Penlink Highway. The 7km route will improve access to the Whangaparaoa Peninsula but it could be up to 20 years before construction starts, according to a report in the New Zealand Herald newspaper. The local authority-controlled Auckland Transport hasn't decided if it will pay for the proposed four-lane toll road that would include a 540m bridge over the Weiti River. An Auckland Transport spokesman said
August 9, 2016 Read time: 2 mins
The final hurdle regarding land settlement has been cleared for Auckland’s ambitious US$274 million Penlink Highway.

The 7km route will improve access to the Whangaparaoa Peninsula but it could be up to 20 years before construction starts, according to a report in the New Zealand Herald newspaper.

The local authority-controlled Auckland Transport hasn't decided if it will pay for the proposed four-lane toll road that would include a 540m bridge over the Weiti River. An Auckland Transport spokesman said they did not have construction funding but were "regularly reviewing the priority" for Penlink.

The newspaper reported that the promoters estimate Penlink could attract 16,600 vehicles per day and use a toll system similar to the Northern Gateway - the first toll road in New Zealand to be fully electronic. Northern Gateway extends the Northern Motorway (SH1) 7.5km further north from Orewa to Puhoi.

Auckland Chamber of Commerce chief executive Michael Barnett recently wrote an opinion article for in the Herald, saying that Penlink's cost would be "modest" compared with the recent larger projects. Its benefit-cost ratio of 2.9 also gave it a rating higher than several of NZTA's Roads of National Significance, he reportedly said.

Related Content

  • Russia seeks outside investment in road building
    November 6, 2012
    The Russian road building industry is on the verge of big changes as it bids to improve quality and speed of construction says Eugene Gerden The Russian road building industry is on the verge of big changes as the national government considers creating conditions to attract foreign companies to build roads in the country. According to a recent order of President Vladimir Putin, due to poor quality and high cost of road construction, there is a need for the development of a mechanism to attract foreign compa
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Austrian road transport industry anger over 8% HGV road toll rise
    December 11, 2013
    Austria's road transport industry is threatening to challenge in the European Court of Justice state-owned motorway operator Asfinag's plan to increase modern HGVs road toll by 8% in 2014. The Austrian transport ministry has ordered that toll prices should be increased by 2.5% from the beginning of January 2014, in order to adapt to inflation. But the price increase for modern HGVs, such as Euro 6 vehicles, is set to be significantly higher in order to keep the volume of toll income stable, as there are now
  • Herrenknecht’s Alice heads back underground at Waterview
    December 19, 2014
    Alice, one of world's largest tunnel boring machines, has started its second tunnel drive for the Waterview Connection project in Auckland, New Zealand. The 90m-long, 3100tonne tunnel borer completed the first twin tunnel, at 2.4km, in September after 11 months of digging, as World Highways reported at the time. The machine has a boring diameter of 14.46m and its cutting wheel is driven by 24 electric motors with a total output of 8,400kW.