Skip to main content

Veenix wins Dutch A9 widening work

The consortium Veenix, which includes Macquarie Capital, FCC, Count & Cooper and Siemens, will widen a 1.3km section of the A9 motorway in the Netherlands. The losing consortium has not appealed against the open tender decision for the contract which Rijkswaterstaat – the Dutch infrastructure and water authority – says will be around €808 million. There are no Dutch companies in the Veenix consortium.
September 13, 2019 Read time: 1 min

The consortium Veenix, which includes 2378 Macquarie Capital, 4914 FCC, Count & Cooper and 1134 Siemens, will widen a 1.3km section of the A9 motorway in the Netherlands.

The losing consortium has not appealed against the open tender decision for the contract which Rijkswaterstaat – the Dutch infrastructure and water authority – says will be around €808 million.

There are no Dutch companies in the Veenix consortium.

For more information on companies in this article

Related Content

  • New Mersey gateway bridge project underway
    September 23, 2015
    Work is starting on the approach viaducts for the new Mersey Gateway Bridge in the UK. The project is using longest bridge-building machine in Europe, which was named during a ceremony to mark the latest key stage the Mersey Gateway Project. Most machines of this kind can only build bridge spans of up to 60m. However, the MSS for the Mersey Gateway Bridge was specially made so it is able to cast spans of up to 70m.
  • African Development Bank funds road to Africa’s largest wind farm
    February 20, 2014
    Shem Oirere discusses a new road connecting with a wind farm development in Kenya The African Development Bank will provide 45% of the funding needed for the rehabilitation and rebuilding of a new 200km road which leads to Africa's largest wind farm project, located in northern Kenya. The bank said the $13.5 million grant for rehabilitation of the existing Laisamis – Ngurunit – llaut - South Horr – Loyangalani road- will be provided by the Government of the Netherlands. The bank says works on the road will
  • SWOV says Dutch roads too narrow and need widening to cut accidents
    August 15, 2013
    The scientific institute on traffic safety Stichting Wetenschappelijk Onderzoek Verkeersveiligheid (SWOV) in the Netherlands has called for many national roads to be widened to cut accident levels. SWOV argues that a large share of Dutch roads with a 80km/h maximum speed limit are too narrow. Such roads are on average 7.5m wide, making them, SWOV says, among the narrowest in the world, with traffic having an average 2.75m of space to use. According to SWOV this should be at least 3.3m, which, it claims, cou
  • Kier picks up London tunnel deal
    February 1, 2021
    The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.