Skip to main content

Vancouver eyes bridge, tunnel options

The Burrard Inlet Rapid Transit Study has listed five potential crossings.
By David Arminas September 25, 2020 Read time: 2 mins
The technical feasibility study was led by engineering consultancy Mott MacDonald Canada (photo: British Columbia Ministry of Transportation and Infrastructure)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel proposals and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration are:
•     Downtown Vancouver to Lonsdale via First Narrows (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Brockton Point (tunnel crossing)
•     Downtown Vancouver to West Vancouver via Lonsdale (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Second Narrows (new bridge crossing)
•     Burnaby to Lonsdale via Second Narrows (new bridge crossing)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

For more information on companies in this article

Related Content

  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Chinese input to Pakistan highway
    April 16, 2025
    Pakistan and China are poised to enhance the Karakoram Highway (KKH)
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • IRD joins Canadian data vault project
    April 9, 2021
    IRD has joined the “Project to Enhance the Reliability and Development of Canada’s Prairie and Northern Region Transportation Network”.