Skip to main content

Vancouver eyes bridge, tunnel options

The Burrard Inlet Rapid Transit Study has listed five potential crossings.
By David Arminas September 25, 2020 Read time: 2 mins
The technical feasibility study was led by engineering consultancy Mott MacDonald Canada (photo: British Columbia Ministry of Transportation and Infrastructure)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel proposals and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration are:
•     Downtown Vancouver to Lonsdale via First Narrows (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Brockton Point (tunnel crossing)
•     Downtown Vancouver to West Vancouver via Lonsdale (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Second Narrows (new bridge crossing)
•     Burnaby to Lonsdale via Second Narrows (new bridge crossing)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

For more information on companies in this article

Related Content

  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Bangkok plans to spend US$3.5bn to build mega underground tunnels
    May 24, 2013
    Thailand could emulate Malaysia's twin smart-tunnel project through its own proposed Thailand Underground Tunnelling Group (TUTG) project, with an estimated investment of US$3.5 billion. Under the TUTG propsal, two large tunnels are to be constructed in Bangkok's underground to channel the city's rainwater surplus during heavy monsoons to refill its underground reserves whose water levels are now decreasing. When there is no major flood in Bangkok, the tunnels would be transformed into an underground roadwa
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Beca Uses 3D Design and a Collaborative Environment on Takitimu North Link Project
    May 25, 2023

    The western Bay of Plenty region in New Zealand, south of Auckland on the North Island, is one of the fastest-growing regions in the country. Growing traffic in the area, with many serious crashes, strained road systems. To improve safety, access, travel options, and to support economic development in the area, Waka Kotahi NZ Transport Agency initiated the Takitimu North Link project.