Skip to main content

Vancouver eyes bridge, tunnel options

The Burrard Inlet Rapid Transit Study has listed five potential crossings.
By David Arminas September 25, 2020 Read time: 2 mins
The technical feasibility study was led by engineering consultancy Mott MacDonald Canada (photo: British Columbia Ministry of Transportation and Infrastructure)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel proposals and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration are:
•     Downtown Vancouver to Lonsdale via First Narrows (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Brockton Point (tunnel crossing)
•     Downtown Vancouver to West Vancouver via Lonsdale (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Second Narrows (new bridge crossing)
•     Burnaby to Lonsdale via Second Narrows (new bridge crossing)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

For more information on companies in this article

Related Content

  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • New bridge for Canada?
    March 5, 2012
    Plans may be changed for Canada's US$1 billion Patullo Bridge project.
  • Shortlist set for Lower Thames tunnel work
    April 9, 2021
    Bam Nuttal, Bouygues, Dragados and Hochtief are in the running for the UK project.