Skip to main content

Vancouver eyes bridge, tunnel options

The Burrard Inlet Rapid Transit Study has listed five potential crossings.
By David Arminas September 25, 2020 Read time: 2 mins
The technical feasibility study was led by engineering consultancy Mott MacDonald Canada (photo: British Columbia Ministry of Transportation and Infrastructure)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel proposals and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration are:
•     Downtown Vancouver to Lonsdale via First Narrows (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Brockton Point (tunnel crossing)
•     Downtown Vancouver to West Vancouver via Lonsdale (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Second Narrows (new bridge crossing)
•     Burnaby to Lonsdale via Second Narrows (new bridge crossing)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

For more information on companies in this article

Related Content

  • Green is good for road construction with National Highways
    July 25, 2024
    Green technology is now good for road construction with National Highways.
  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.
  • “Structurally deficient” US bridges need warning signs, says ARTBA
    April 10, 2015
    A US construction sector group wants warning signs to be posted on bridges designated “structurally deficient" and in need of repair by state engineers. More than 61,000 structurally deficient bridges remain in need of significant repair, according to the American Road & Transportation Builders Association (ARTBA), which analysed the US Department of Transport’s National Bridge Inventory database. However, by the end of 2014 there were more than 2,000 fewer structurally deficient structures than in 20
  • Importance of continued transportation investment
    February 27, 2012
    The US infrastructure network requires urgent attention - * T Peter Ruane. America's transportation infrastructure was once the "shining light on top of the hill." Major investments in a national highway, bridge, transit, airport, port and waterway system during the 20th century paid great dividends. The free and efficient flow of goods and people across the 50 states led to unparalleled economic expansion. The mobility and prosperity resulting from an interconnected infrastructure was a model for the world