Skip to main content

Vancouver eyes bridge, tunnel options

The Burrard Inlet Rapid Transit Study has listed five potential crossings.
By David Arminas September 25, 2020 Read time: 2 mins
The technical feasibility study was led by engineering consultancy Mott MacDonald Canada (photo: British Columbia Ministry of Transportation and Infrastructure)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel proposals and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration are:
•     Downtown Vancouver to Lonsdale via First Narrows (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Brockton Point (tunnel crossing)
•     Downtown Vancouver to West Vancouver via Lonsdale (tunnel crossing)
•     Downtown Vancouver to Lonsdale via Second Narrows (new bridge crossing)
•     Burnaby to Lonsdale via Second Narrows (new bridge crossing)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

For more information on companies in this article

Related Content

  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • A new bridge link will improve connectivity in the Ural mountains
    April 16, 2012
    By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.
  • ARTBA calls for more bridge repairs in US
    February 18, 2016
    The American Road & Transportation Builders Association (ARTBA) is calling for more bridge repairs in the US. There are still too many structurally deficient bridges in the US according to a recent analysis. This report states that while there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014, there are still 58,500 on the structurally deficient list. Worse still, at the current pace of bridge investment it will take at least 21 years before these bridges are all replace
  • Highways Agency appoints firms to consider A27 bypass options
    December 15, 2014
    The Highways Agency in the UK has appointed a joint venture between Mott MacDonald and Grontmij to analyse various options for upgrades to the A27 Chichester Bypass. The aim of this project is to improve traffic flow and relieve congestion. The bypass is a 5km dual carriageway with five roundabouts and one signal control junction. It provides a key east-west transport link along the south coast of England. This connects Brighton, Worthing, Chichester, Portsmouth, Southampton. It currently suffers from heavy