Skip to main content

Uzbekistan targets of 2,700km of new highways by 2019

Uzbekistan plans to build around 2,700km of roads by 2019 at a cost of around US$590 million. Around 2,280km will have a bituminous concrete surface and 418km will be a concrete surface. In July, the World Bank said it will grant Uzbekistan a $200 million loan for 25 years towards paying for the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to UzDaily.uz. Uzbekistan’s government also reported that around 117km roads were built in the first half
September 30, 2015 Read time: 1 min
Uzbekistan plans to build around 2,700km of roads by 2019 at a cost of around US$590 million.

Around 2,280km will have a bituminous concrete surface and 418km will be a concrete surface.

In July, the World Bank said it will grant Uzbekistan a $200 million loan for 25 years towards paying for the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal UzDaily.uz Visit uzdaily.uz website false http://uzdaily.uz/ false false%>.

Uzbekistan’s government also reported that around 117km roads were built in the first half of this year.

Related Content

  • Komatsu adds WA470 to its Dash-7 wheel loader range
    April 18, 2013
    Komatsu has unveiled its 23,590kg operating weight WA470-7 wheel loader, which offers improved efficiency, lower fuel consumption, improved operator comfort and enhanced serviceability. It is powered by a 203kW Stage IIIB/ EPA Tier 4I Komatsu SAA6D125E-6 engine, which is said to lower fuel consumption by 10% to 15% compared with the WA470-6. The engine is fitted with EGR, a hydraulically-actuated variable geometry turbocharger, and an automatically regenerating DPF. As with all Komatsu Stage IIIB machines,
  • E&E Event 2018 Berlin: an asphalt industry fit for purpose
    April 3, 2018
    Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15. But early registration for a discount is still available, however the deadline is fast approaching – April 16. The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.
  • Ormet’s experienced lifting and handling solutions
    January 6, 2017
    The Ormet Group has an impressive 40 years of experience in the world of lift and handling. One of its divisions, Jekko, manufactures high quality self-propelled crawler minicranes, minipickers and vacuum technology. Overmat, another Ormet Group division, manufactures high quality automatic self-propelled mixers for construction and other equipment for handling and logistics of the modern construction site.
  • Ormet’s experienced lifting and handling solutions
    April 8, 2013
    The Ormet Group has an impressive 40 years of experience in the world of lift and handling. One of its divisions, Jekko, manufactures high quality self-propelled crawler minicranes, minipickers and vacuum technology. Overmat, another Ormet Group division, manufactures high quality automatic self-propelled mixers for construction and other equipment for handling and logistics of the modern construction site.