Skip to main content

UK’s A14 widening project ramps up with a recruitment drive

Contractors are gearing up for one of the UK’s largest road projects, the 34km widening of the A14 between the town of Huntingdon and city of Cambridge. The €1.7 billion government-funded scheme will be delivered over four years by a joint venture between Skanska, Costain, Balfour Beatty and Carillion.
November 11, 2016 Read time: 1 min

Contractors are gearing up for one of the UK’s largest road projects, the 34km widening of the A14 between the town of Huntingdon and city of Cambridge.

The €1.7 billion government-funded scheme will be delivered over four years by a joint venture between 2296 Skanska, 2319 Costain, 1146 Balfour Beatty and 2435 Carillion.

The new bypass and widened A14 will open to traffic in 2020, although some finishing work such as the removal of the A14 viaduct in Huntingdon will continue beyond that with occasional road closures, according to 8100 Highways England. There will also be improvements in Huntingdon town centre, including the demolition of the A14 viaduct and new local access roads.

Specialist engineering recruiter Matchtech has been named as one of four preferred agencies to source contractors for the scheme. Skillsets required include foremen, supervisors, agents, project managers, planners, quantity surveyors and engineers.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Private owners seek a buyer for the UK’s only toll road, M6 Toll
    February 15, 2016
    Britain’s only toll road, the motorway M6 Toll, is up for sale by its owners, a consortium of banks that hope to recover some of the €2.45 billion of debt. The 27 owners of M6 Toll, including Crédit Agricole, Commerzbank and Banco Espirito Santo, took over the 43km pay-as-you-go toll road from infrastructure group Macquarie in December 2013 after a debt restructuring. Midland Expressway Limited (MEL), part of Macquarie Atlas Roads, continues to operate the six-lane motorway around the English city of
  • UK’s Saltash Tunnel gets hi-tech safety upgrade
    June 4, 2019
    The UK's Saltash Tunnel is undergoing a major US$1.53 million upgrade to the incident detection system to provide quicker detection of vehicle fires and other incidents. The scheme will see close to 5,000m of cable installed inside the 410m tunnel on the A38 in the county of Cornwall in England. Overall design of the new system and integrated control systems are from PDS – Paul Ducker Systems – and includes smoke detectors from UK firm SICK Sensor Intelligence and SmartVision fiber-optic temperature sensi